I'm trying to brainstorm possible occurences other than the three examples (utility interruptions, labor shortages, key equipment failures)given in 4.9.b.2 that might require some sort of reaction plan. If you have any real examples of emergency events that would require a contingency plan I would appreciate the input. IP: Logged |
|
Scott Knutson Forum Contributor Posts: 35 |
As I go through the differnt scenarios we have addressed in our contingency plan, I really can't come up with anything outside of the categories listed. We have plans for downed networks (key equipment), loss of key personnel (labor shortages) and lightening strikes (utility interruptions). The only other things that we cover that may not fall under these categories include chemical spills (we build semiconductors) that cause evacuations (prolonged or otherwise - although evacuations could be considered labor shortages I guess) and fires (normally a result of faulty equipment). Hope this helps. IP: Logged |
|
Marc Smith Cheech Wizard Posts: 4119 |
I wonder what ever happened to Scott... IP: Logged |
All times are Eastern Standard Time (USA) | next newest topic | next oldest topic |
![]() |
Hop to: |
Your Input Into These Forums Is Appreciated! Thanks!