The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  QS-9000
  QS9000 3rd edition, 4.17

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   QS9000 3rd edition, 4.17
ROSEMUND J.
Lurker (<10 Posts)

Posts: 1
From:
Registered: Mar 99

posted 17 March 1999 04:36 AM     Click Here to See the Profile for ROSEMUND J.   Click Here to Email ROSEMUND J.     Edit/Delete Message   Reply w/Quote
There are few requirements under 4.17.1, where:

1. the internal audit should cover all shift
2. Audit schedule updated annually, and

3. When internal/external nonconformance or customer complaints occur, the planned audit
frequency should be increased.

Please see below situation:

1) I believe this is only applicable to manufacturing related elements, such as 4.9,
4.12...etc. In my factory, I have QA specialist/operators doing shiftly audit focusing on product and process conformances. I also have interbal quality system auditor (trained and certified by consultants) focusing on systemic issue. Is this meet the intent?

2. What does it mean "updated annualy? My consultant told me, there should be a planned audit schedule and the schedule can only be changed annually. I have to follow the schedule consistantly without fail except there is special event. This is not feasible as a lot of activities, customer visit/audit, corperate audit..etc happening. We have to change the schedule to maximize our resources. Could anyone give me some suggestion, comment?

3. I do not know how to meet this. I believe every company has internal/external
non-conformance, if everytime we need to increase the frequency, I will be in trouble. Please advice.


Thanks.

IP: Logged

Batman
Forum Contributor

Posts: 111
From:Kane, PA 16735
Registered:

posted 17 March 1999 07:04 PM     Click Here to See the Profile for Batman   Click Here to Email Batman     Edit/Delete Message   Reply w/Quote
Hi Rosemund

1. Internal audits should "verify whether quality activities and the related results comply with planned arrangements and to determine the effectiveness of the quality system." It is difficult to restrict this to only manufacturing activity.

You seem to have folks involved in auditing, that's good. But the personnel should be independent of the activity that is being audited. We use operators but in different departments than they work.

2. Typically an audit schedule is prepared up to a year in advance. After accumulating findings and any other nonconformances over that time you must review those instances and decide if and where and what to adjust in your next audit schedule. If you determine that there is not enough documented reason to increase the frequency, you should have a record of that meeting and the decisions made.
Satisfying the customer - a visit for instance - should take precedence over a scheduled audit, if it must. I think an isolated instance or two would not offend your registrar, or your management. I would hope that if this becomes an issue, that management allocates resources to overcome this (QS 4.1.2.2)

3. Unfortunately it is a requirement, somewhat as a follow-up to corrective actions from findings and internal and external nonconformances, to increase your audits. Consider the reasoning - you have what you think is a good system, but the customer found a problem. Your system needs improvement, and auditing is one method of verifying this.

Hope this helps.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!