|
This thread is carried over and continued in the Current Elsmar Cove Forums
|
The New Elsmar Cove Forums
|
The New Elsmar Cove Forums
![]() QS-9000
![]() Operator Instructions
|
| next newest topic | next oldest topic |
| Author | Topic: Operator Instructions |
|
Marc Smith Cheech Wizard Posts: 4119 |
"Enriquez, Rodolfo" wrote: --> Hi Marc, I'm sure you can help me, my name is Rodolfo Enriquez, Please cite the specific QS paragraph you are interpreting --> ...but I'm wondering if you know if some of them can be skipped, I'm What do you mean by 'skipped'? In many cases ->Yes - by substituting training. But you have to weigh things like complexity of assembly/operation and such. You may have operator set-up and you may have a specific group or person who only does set-ups - you have to think about over all issues like these in the scheme of your systems. Can you cite an instance where training can effectively replace documentation? Also see: Elsmar.com/accolades.html#document This was from an ISO audit but there are a number of basic principles at work in both. --> Also, would you please tell me where can I find in the net some Templates from others might prove more harmful and expensive in the long run than helpful. You have to look at YOUR company and do what YOUR business and processes require. --> Thanks in advance. Sincerely Rodolfo Enriquez. Please remember, everyone - If you want to post a question (start a NEW TOPIC) and/or if you want to REPLY to an existing thread (topic), kindly register. if you haven't registered yet, see: Register in the Elsmar Cove Forum It's free - there is no fee or other requirement. The registration is just to keep 'jokers' and disruptive folks out so that those of us who are serious don't have to put up with disruption. [This message has been edited by admin (edited 23 July 1999).] IP: Logged |
|
barb butrym Forum Contributor Posts: 637 |
Everything is weighed.....more training/less paper....But the value needs to be considered. Maybe the paper is in the training document. Sometimes we spend all together too much time trying to find a way around doing something, when the value is going through the steps to get it done. I find charting a process tells a tale of its own, and always adds value somewhere..... digital pictures and clips can be inserted..hyperlinks to more detailed drawings.....training status and so on.....jump in and try one, and see what it does for you and everyone involved. I can almost guarantee a 'light' will go on somewhere. IP: Logged |
|
B. Maynard Forum Contributor Posts: 23 |
Here is a example I also use Instructios for my Inspectors along with the Control plan. Bill [email protected] Only copies (Black) of this document are to be placed in process, Red is the controlled Master 1.0 Purpose To provide standard instructions that will be used during the injection molding process. 2.0 Scope Molding Operator in-house work instructions for the Tervis Tumbler Outer Liner. 3.0 Procedure 3.1 Short shots, grease, flash, and contamination are not allowed, this is a cosmetic part. 3.2 Visually inspect the part for bubbles, black specs, color tint deviation from sample part, shooting stars or scratches, milky type swirls or blush on bottom, "vee's" or flow lines. 3.3 White inspection gloves must be worn when handling the parts. 3.4 Parts must run semi-automatic and pulled from the mold each shot. 3.5 Notify supervisor if a problem occurs.
4.1 Place 3 layers of 24 to a customer supplied box using customer supplied cardboard layers and dividers for a total of 72 pcs to a box. Form: QSWI-09.02 01/01/98 Rev.â0â IP: Logged |
All times are Eastern Standard Time (USA) | next newest topic | next oldest topic |
![]() |
Hop to: |
Your Input Into These Forums Is Appreciated! Thanks!
