The New Elsmar Cove Forums   The New Elsmar Cove Forums
  QS-9000
  Calibration - Process gauges

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Calibration - Process gauges
J. Kay
unregistered
posted 14 September 2000 09:18 AM           Edit/Delete Message   Reply w/Quote
My company is preparing to upgrade our ISO system to QS-9000. There is difference of opinion as to whether process gauges (i.e. pressure, temperature, rpm, etc.) are to be included in the gauge control system (calibration / verification). We are a raw material compounder and all product is accepted or rejected in a laboratory. Has anyone experienced problems with registration to QS-9000 where process gauges were not in the gauge control system?

IP: Logged

Howard Atkins
Forum Wizard

Posts: 202
From:Israel
Registered:

posted 15 September 2000 12:22 AM     Click Here to See the Profile for Howard Atkins   Click Here to Email Howard Atkins     Edit/Delete Message   Reply w/Quote
I believe that if the gauges are used as an indication of the process and not to qualify the product then they do not need to be calibrated.
If you are performing SPC on the process and using these gauges then they ned to be calibrated.
What does the machinery book say about these gauges?

IP: Logged

Sam
Forum Contributor

Posts: 244
From:
Registered: Sep 1999

posted 15 September 2000 08:35 AM     Click Here to See the Profile for Sam   Click Here to Email Sam     Edit/Delete Message   Reply w/Quote
I fought this battle many times; and lost every time.
The standard reply from an auditor is "If you don't need the gauges, then why do you have them in the process?"
If the gauge is not part of the machine and you really don't need it, then remove it.
If the gauges are part of the machine,i.e., extrusion presses, then the mfg put them there for a purpose;to controll the process.
Rule of thumb:
Any item that is used to verify, validate or otherwise used to indicate the quality of the product/process is required to be controlled.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!