The New Elsmar Cove Forums   The New Elsmar Cove ForumsThe Elsmar Cove Forums
  QS-9000
  Control plan Methodology

Post New Topic  Post A Reply
profile | register | preferences | faq

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Control plan Methodology
KayJay
Lurker (<10 Posts)

Posts: 3
From:Taejon, Korea
Registered: Jun 2001

posted 25 June 2001 04:51 AM     Click Here to See the Profile for KayJay   Click Here to Email KayJay     Edit/Delete Message   Reply w/Quote
Any idea of you for this!!!

Book "APQP" described in 6.2-Control Plan Methodology page 33.
"The Control Plan does not replace the information contained in detailed operator instruction."

Can be understood;
A. If you describe in detail operator instruction - control point with numbered specification such as "+/- 0.01mm" or "dry at temp.150 degree for 2 min. +/- 5 sec." etc. then you do not need to describe it in detail at Control plan ?

or

B. Even you wrote so detail information in operator instruction, you should specify in detail on Control plan with numbers like as APQP book presented supplement B. (example)

As possible as I can, I guide our member to describe control plan in detail whether they wrote operator instruction or not. They just want to describe the control methods with operator instruction number not in detail like "see doc# 1234.."

Anybody has same experience for this?

IP: Logged

Al Dyer
Forum Wizard

Posts: 814
From:Lapeer, MI USA
Registered: Oct 2000

posted 25 June 2001 10:04 AM     Click Here to See the Profile for Al Dyer   Click Here to Email Al Dyer     Edit/Delete Message   Reply w/Quote
KayJay:

The control plan (and FMEA's) are used as the driver for operator instructions.

The control plan might say that characteristic #3 is monitored during an in-process inspection function. The related work instruction would tell the operator how to monitor characteristic #3. Such as instructions on how to master and use the applicable gages, how to set up the machine, and how to enter process data into an SPC system.

In most systems I've seen, all blueprint/process requirements are included on the control plan but not all characteristics need a work instruction.

Hope this helps,

ASD...

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply
Hop to:

Contact Marc Smith | The Elsmar Cove Home Page

Please Visit the new Elsmar Cove Forums! All these threads are there and much more!

Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!