  Statistical Techniques and 6 Sigma
  On-going capability

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   On-going capability
Dawn
Forum Contributor

Posts: 245
From:St. Marys, PA
Registered: Sep 98

posted 24 September 1999 08:42 PM     Click Here to See the Profile for Dawn   Click Here to Email Dawn     Edit/Delete Message   Reply w/Quote
To be in compliance with on-going capability:
Can we decide for ourselves how often to measure cpk? Do we have to do a capability study on every order?
Can we use our sample size (6 pieces) maintain those numbers and when we have run 5 orders; we have 30 numbers to do a capability study and determine if our cpk is higher or lower? Will this be acceptable?

------------------

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 28 September 1999 04:45 AM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
I can't help with short run capability. Anyone else have any experience with this?

IP: Logged

Tony Venn
Lurker (<10 Posts)

Posts: 1
From:UK
Registered: Sep 1999

posted 29 September 1999 07:51 AM     Click Here to See the Profile for Tony Venn   Click Here to Email Tony Venn     Edit/Delete Message   Reply w/Quote
You can decide and document how often to measure Cpk yourself. You really need to decide on a frequency that suits you.
If you take 6 pieces over 5 runs and use this data to calculate Cpk, what actions do you take if you get an NG result? You've already shipped product.
Can you use data from initial capability studies, calculate control limits and run an X bar & R chart, taking a sample each time you manufacture product? If sample is in control each time it shows you don't have any major changes. You could then recalculate Cp & Cpk on a rolling basis using the last say 10 or 20 results.

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 29 September 1999 07:56 AM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
Thanks, Tony. Your help is appreciated!

IP: Logged

margherita
Lurker (<10 Posts)

Posts: 6
From:italy
Registered: Apr 99

posted 26 October 1999 03:22 PM     Click Here to See the Profile for margherita   Click Here to Email margherita     Edit/Delete Message   Reply w/Quote
Following my experience, I am SPC supervisor and have more than 100 XR charts, it is not necessary to calculate too often your CP/CPK index.
In the past I had to send to our customers a certification about CPK for each lot we sent.
Then we have dimostrated them the state of control of our processes.
Now I update the CPK only in the case something is changed in the process, e.g. new raw material (new supplier or new parameters...), or speedy, or when there is a stable change in the position of the process.
When your process dimostrates a state in control the CPK index doesn't change and you don't need to update.
Usually I update this index once/twice per year (after 80/100 values) and I don't find big difference between the old and the last calculation.

------------------

IP: Logged

Dawn
Forum Contributor

Posts: 245
From:St. Marys, PA
Registered: Sep 98

posted 27 October 1999 10:04 PM     Click Here to See the Profile for Dawn   Click Here to Email Dawn     Edit/Delete Message   Reply w/Quote
But does that satisfy the QS intent?

IP: Logged

Laura M
Forum Contributor

Posts: 299
From:Rochester, NY US
Registered: Aug 1999

posted 28 October 1999 09:17 AM     Click Here to See the Profile for Laura M   Click Here to Email Laura M     Edit/Delete Message   Reply w/Quote
Dawn, I believe it does. I used a similar strategy. If a process originally meets CPk requirements, mean centered, etc, and you remain in control, then you have no reason to believe your CPk would have changed. I think the 3rd edition of QS is a little clearer on this than the 2nd. Page 37 - "The supplier shall maintain......to accomplish this...ensure that the control plan and Process flow diagram are implemented."

I had a bit of a problem at an inital assessment (to the second edition) because the auditor didn't understand SPC and was looking for a procedure that stated exactly how often we recalculate. Our procedure at the time stated something like "when a process change is implemented, or control charts indicate....Cpk will be recalculated" Ended up reading alot like the 3rd edition.

Would welcome other thoughts on this. Our strategy was intended to meet the standard without putting ourselves out of business by performing unnecessary statistical analysis.


IP: Logged

David Guffey
Forum Contributor

Posts: 49
From:St. Joseph MI, USA
Registered: Oct 1999

posted 28 October 1999 04:53 PM     Click Here to See the Profile for David Guffey   Click Here to Email David Guffey     Edit/Delete Message   Reply w/Quote
Laura hit the nail on the head when she referred to unnecessary statistical analyses. One of the most important things to keep in mind is customer and / or internal classification of characterisitics. If you do not have to chart, don't, unless you can save money by effecting improvements. Once a Cpk gets above 3.0 (in the 4-6 range), you really need to change how you are charting. Fewer samples may be needed, for example. Too many of us, in our zeal to demonstrate statisitical capability, have overdone it to the extent that we lost the positive value of good, effective control charting.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!