  Statistical Techniques and 6 Sigma
  Cpk for casting dimensions

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Cpk for casting dimensions
abhattacharya
unregistered
posted 12 September 2000 04:56 AM           Edit/Delete Message   Reply w/Quote
We are manufacturing ductile iron castings and supplying to the automotive sector in India. We are in the process of implementing QS9000 systems.
In one of the castings, the customer has given us more than five critical dimensions for which we have to give the Cpk values with every lot. We find that getting CpK values > 1 for each critical dimension simultaneously is quite difficult for founding operations (We are using green sand process for manufacturing castings).

Are we to reject the castings even because one out of the five dimensions has CpK lower than one? What's the way out?

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 02 October 2000 11:39 AM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
I'm bumping this up on the listing. I'd love to hear from someone who has an ideas on this situation.

IP: Logged

proudliberal
unregistered
posted 02 October 2000 01:38 PM           Edit/Delete Message   Reply w/Quote
This is something that should have been negotiated prior to production. If your "critical" dimensions are really critical to function, you will probably be required by your customer to implement some system to prevent non-conforming product from reaching his dock.

Additionally, I would get an agreement from him to eliminate the Cpk requirement on the dimension based on your action plan. This is assuming that your process cannot meet the requirement. If you can demonstrate that the variables in your process (temperature, cooling time, etc)are controllable and controlled (via Cpk), he might be more amiable to a alternate plan.

Remember, the intent of Cpk is to assure the shipment of conforming product only. Focus your and his attention on that.

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 02 October 2000 01:46 PM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
So - you're saying that what is possible with consideration to 'state-of-the-art', materials, tolerances (combined), should be known and considered prior to acceptance of contract. I have seen this in the injection molding industry. The materials were such that there was no way to meet the requirement tolerances. This was not 'discovered' until run-off, of course. Now we need an engineering change.....

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!