The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  Statistical Techniques and 6 Sigma
  Cpk or Ppk in packaging closure manufacturing?

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Cpk or Ppk in packaging closure manufacturing?
Ends
Lurker (<10 Posts)

Posts: 1
From:Memphis,TN, USA
Registered: Oct 2000

posted 09 October 2000 03:54 PM     Click Here to See the Profile for Ends   Click Here to Email Ends     Edit/Delete Message   Reply w/Quote
I am a Quality Manager in a closure/end manufacturing facility. Our products are used on products such as composite cans for powdered beverage and peanuts. The Cpk/Ppk is a vital measurement that our company lives and dies by. We currently use DataMyte collection systems and run Turbo SPC, a dos based program. Here recently, I pulled raw data out of Turbo and transfered it over to Minitab. After doing this, I discovered that Turbo's Cpk was the Ppk in Minitab. Many of our customers want Cpk reports for the products they are receiving. But our company wants long term capability, Ppk. As I understand, Ppk makes an assumption on what you will do long term if you make no changes. Is this correct? Our process involves metal stamping, we change dies and die components on a certain number of strokes. Therefore, we are consistently makes changes from month to month. What would be the best measurement to use in this type of manfacuring?

IP: Logged

Al Dyer
Forum Wizard

Posts: 622
From:Lapeer, MI USA
Registered: Oct 2000

posted 12 October 2000 11:02 AM     Click Here to See the Profile for Al Dyer   Click Here to Email Al Dyer     Edit/Delete Message   Reply w/Quote
Cpk is used when historical data shows the process to be stable. It is based on using a sample standard deviation.

Ppk is used when a process is chronically unstable but showing a predictable pattern. It is based on the standard deviation of not the sample size, but of all the individual samples.

Your company needs to base its decisions on the above criteria and as always give the customer what he wants. Most software programs today have an option to report either or both of these measurements. One can be used internally and one can be used for the customer.

ASD...

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 12 October 2000 11:09 AM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
Also see: https://elsmar.com/ubb/Forum10/HTML/000001.html

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!