|
This thread is carried over and continued in the Current Elsmar Cove Forums
|
The New Elsmar Cove Forums
|
The New Elsmar Cove Forums
![]() Statistical Techniques and 6 Sigma
![]() cmk
|
| next newest topic | next oldest topic |
| Author | Topic: cmk |
|
Kimkolora Pen unregistered |
hello every one, i am an enginnering student , i want to know what is the Cmk, and wht is the difference between the R&R study and the Cmk? because i am doing my report for my school, i am completely lost. Thanks in advance IP: Logged |
|
Rick Goodson Forum Wizard Posts: 102 |
Kim, I am not familiar with the term 'Cmk'? Where did you see this term and how was it used? Could it possible have been 'Cpk'? If so, I can help explain the relationship of Cpk and R&R Studies. IP: Logged |
|
SteelMaiden Forum Contributor Posts: 28 |
I am not a guru, but Cmk is machine capability, Cpk is process capability. Can't tell you what all the formulas are (at least not without digging through a bunch of old paperwork), but that is how the differences were explained to me. IP: Logged |
|
Don Watt Forum Contributor Posts: 70 |
Try the following links for explantions of capability indices www.qualityadvisor.com/start.htm www.xberry.fsnet.co.uk IP: Logged |
|
Marc Smith Cheech Wizard Posts: 4119 |
For a good thread on Cp, Cpk, Ppk, etc., see: https://elsmar.com/ubb/Forum10/HTML/000001.html IP: Logged |
All times are Eastern Standard Time (USA) | next newest topic | next oldest topic |
![]() |
Hop to: |
Your Input Into These Forums Is Appreciated! Thanks!
