|
This thread is carried over and continued in the Current Elsmar Cove Forums
|
The New Elsmar Cove Forums
|
The New Elsmar Cove ForumsThe Elsmar Cove Forums
![]() Statistical Techniques and 6 Sigma
![]() High Cpk's and Control Charts
|
| next newest topic | next oldest topic |
| Author | Topic: High Cpk's and Control Charts |
|
MSAFAI Forum Contributor Posts: 42 |
Hi everybody, In processes, where we have high Cpk's (like 2 or more), is it justified to stop using control charts (like X-bar and R) and instead, calculate Cpk every month or so ?
[This message has been edited by MSAFAI (edited 04 August 2001).] IP: Logged |
|
Rick Goodson Forum Wizard Posts: 135 |
MSAFAI, It depends on why you are running control charts to begin with. If customer mandated you need to discuss it with the customer. Even if you decide to discontinue them I would not leave the process run without some checks. You might consider pre-control charts as an alternative. Rick IP: Logged |
|
AJLenarz Forum Contributor Posts: 42 |
MSAFAI, I agree with Rick. It would not be wise to totally abandon process monitoring. If you have a high CPK, you may want to consider reducing the frequency of inspection and charting (with the consent and acknowledgement of the customer of course). Also, the comment was made to stop control charts and calculate CPKs every month or so. The SPC manual’s definition of CPK is: “The capability index for a stable process…”. If you discontinue the use of the SPC chart then you will not know if your process is stable and capable. If you don’t know if your process is capable, can you calculate and report a CPK value? IP: Logged |
|
MSAFAI Forum Contributor Posts: 42 |
Dear Rick Thanks for your input. 2- I didn't mean leave the process without any control. I meant just not to use control CHARTS. Normal periodic checks, of course, remain. Thanks again IP: Logged |
|
MSAFAI Forum Contributor Posts: 42 |
Dear AJLenarz, Thanks for your comment. About calculating Cpk on stable processes, I agree with you. But for calculating Cpk we usually use control chart (at least for 20-25 subgroup) to establish control, then we proceed to Cpk calculation. Thanks again, [This message has been edited by MSAFAI (edited 06 August 2001).] IP: Logged |
|
Al Dyer Forum Wizard Posts: 814 |
Too all, Would and X-Bar MR chart be applicable in a case when stability and capability have been proven over time and special causes removed from the process? Also, if applicable, could the variable control chart be replaced by an attribute chart under the same circimstances? If so or not, why? ASD... IP: Logged |
|
MSAFAI Forum Contributor Posts: 42 |
Guys, by accident, I found an interesting forum discussion from 1999. Guess where? The same subject is discussed, with good inputs from Don winton. Regards IP: Logged |
|
MSAFAI Forum Contributor Posts: 42 |
quote: Dear Al, 1- As far as I know, X-MR is used in special cases where taking more than one sample each time is not practical (like in a very slow process). If you mean X-MR can reduce sampling, you can achive the same by less frequent sampling. I'm not an expert in this, but I think X-MR has a disadvantage that it is sensitive to non-normality of the underlying distribution (central limit theorem does not hold anymore) 2- About using an attribute chart, I think you would get a flat line (zero defect) almost all the time, even if the process goes out of control (because of high Cp/Cpk) I hope it makes sense Regards IP: Logged |
All times are Eastern Standard Time (USA) | next newest topic | next oldest topic |
![]() |
|
Please Visit the new Elsmar Cove Forums! All these threads are there and much more!
