The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  Tooling and Equipment Suppliers
  T/E Control Plan

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   T/E Control Plan
Laura M
Forum Contributor

Posts: 299
From:Rochester, NY US
Registered: Aug 1999

posted 13 November 2000 03:18 PM     Click Here to See the Profile for Laura M   Click Here to Email Laura M     Edit/Delete Message   Reply w/Quote
Anyone have a good example of a T/E company control plan? I'm envisioning one that can get modified slightly, depending on the job, but about 80% of the standard can be covered by it. For example, receiving inspection, in-process inspection (after controls build, before debug), all the way through the 50/20 and MQ runs. This would be for a custom automated machinery manufacturer.

I'm working on one that I think will work out great....just wondered if I'm reinventing a wheel.

Thanks in advance,

Laura

IP: Logged

Laura M
Forum Contributor

Posts: 299
From:Rochester, NY US
Registered: Aug 1999

posted 20 November 2000 01:08 PM     Click Here to See the Profile for Laura M   Click Here to Email Laura M     Edit/Delete Message   Reply w/Quote
I'll take that as a "no."
May I ask the tooling suppliers that got certified how you handled the PCP requirements? I have some thoughts, but would like to hear from others.

Laura

IP: Logged

louie
Forum Contributor

Posts: 19
From:Rochester Hills, MI
Registered: Feb 2000

posted 01 December 2000 06:56 AM     Click Here to See the Profile for louie     Edit/Delete Message   Reply w/Quote
As a TE supplier, we do not have a "Control Plan" as shown in the APQP manual, we have a project file which covers all the topics - our project managers have checklists to ensure they cover all the requirements and our customer requirements / standards determine our inspections which are designated on our build prints by a box around the measurement required to be within a certain tolerance with an area for the employee checking the tolerance to list the calibrated tool used, date inspected, his/her initials. The measurement taken is noted next to the box denoting the critical measurement. We have totally done away with the "standard" Control Plan form. We still do FMEAs but control our time with a microsoft project timeline showing scheduled (budgeted) hours vs actual hours, so we can make up for overruns in a previous area. Seems to be working fine and passing audit.

Good luck.

IP: Logged

Michael Busha
unregistered
posted 01 December 2000 04:18 PM           Edit/Delete Message   Reply w/Quote
Laura,

The PCP (I call it the Build Process CP)is something I sit down with the 1) project manager, 2) plant manager, 3) quality guy (me), 4) other ket personnel as necessary. You want everyone there who has a stake in the process (don't forget purchasing).

I facilitate it(otherwise nothing gets done). We walk through the build process and try to jot down all key events, key characteristics, safety requirements, environmental stuff, long lead purchase/fab items (both in-house and outsourced), R&M stuff, reviews as necessary, production status meetings (can be the same as reviews), inspection events, shipping/delivery, etc.

It looks much like the project manager's timeline (Microsoft Project)if you look at the line items only. The difference is that you do the breakdown columns on tolerance/spec, eval tech, control method, and action plan (this is a biggy, the auditor always looks for it).

If you have "product families", just develop a CP for the family and then use it (change the header info), adding to it if anything changed. I have a typical "Build Process CP" that can be used to start off any customized build project. Saves me time.

The trick is to get the right people to sit down with you, limit the interruptions, and to be sure no important events are left out.

Hope this helps.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!