  FMEA and Control Plans
  Control Plan Procedures

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Control Plan Procedures
Steven Sulkin
Forum Contributor

Posts: 75
From:Columbus, Ohio
Registered:

posted 17 August 1998 09:33 AM     Click Here to See the Profile for Steven Sulkin   Click Here to Email Steven Sulkin     Edit/Delete Message   Reply w/Quote
In a recent customer audit, I learned about a different approach to control plans. I would appreciate learning how others are tackling this requirement. So, far this is what I have seen:

One control plan for every one or two tier QS9000 firm only.

One to a few control plans that are generic enough to represent the facility. All exceptions (for individual products) are noted in appendices.

Anyone doing it differently? What process have you found to be value added (i.e. help with improvement rather than just meet the requirements)?

If you have a procedure please outline in post or email.

Thanks in advance.

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 17 August 1998 12:15 PM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
Steve - I don't know if you've downloaded and read thru my 'course':

APQP and Control Plan pdf file

But - you might if you haven't.

You can do this in many ways. The 'old' way was product specific. Most of my clients do a control plan for a machine or line because they do more than 1 part. The machine is an operation, if you will, so failure modes will be common no matter what the part - except in some very special circumstances (which I can't even really think of an example to right off hand.

If you download the pdf file, this should be illustrated somewhere around slide 36.

Also, check out:

FMEA pdf

There's some info there as well. This is an older version - I'll post an update here soon.

Actually both are somewhat 'older'. I always keep them a version or 2 behind my 'current' revision 'cause I do like to have something to 'sell'.

Bottom line - IMHO do 'generics'. Less overall work.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

.
. Administrative Options: Close Topic | Archive/Move | Delete Topic.
Post New Topic  Post A Reply . . Hop to: . . .

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!