  FMEA and Control Plans
  Control plan dates

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Control plan dates
Dawn
Forum Contributor

Posts: 245
From:St. Marys, PA
Registered: Sep 98

posted 10 January 2000 08:40 PM     Click Here to See the Profile for Dawn   Click Here to Email Dawn     Edit/Delete Message   Reply w/Quote
This is the best dumb blonde question I have EVER posted on here. Can someone pleeeease tell me what every date is for on the AIAG control plan?
I thank you.

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 11 January 2000 03:52 AM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
What do you mean by 'every date'?

IP: Logged

Dawn
Forum Contributor

Posts: 245
From:St. Marys, PA
Registered: Sep 98

posted 12 January 2000 05:36 PM     Click Here to See the Profile for Dawn   Click Here to Email Dawn     Edit/Delete Message   Reply w/Quote
I posted this when I didn't have everything in front of me, and I still don't, but I was asked what all the dates are for on the contol plan and I didn't have an answer. Sorry. I will review it again tomorrow at work so I know what I'm talking about.
Thanks for the reply, Dawn

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 12 January 2000 09:40 PM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
Looking at the APQP book - there is a control plan 'blank' which has several dates:

Date (Orig.) - The date of the original document.

Date (Rev.) - The most recent revision date.

Supplier/Plant Approval Date - The date your company approves the document.

There are 4 others with If Required noted - These are:

Customer Engineering Approval/Date (If Required)
Customer Quality Approval/Date (If Required)

Your customer should tell you whether either of these is required. Typically one or the other is required.

Other Approval/Date (twice)

These If Required dates are typically not used.

IP: Logged

Dawn
Forum Contributor

Posts: 245
From:St. Marys, PA
Registered: Sep 98

posted 15 January 2000 06:56 PM     Click Here to See the Profile for Dawn   Click Here to Email Dawn     Edit/Delete Message   Reply w/Quote
Thanks,
You straightened me out again.

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 16 January 2000 05:59 PM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
That will be 5 cents, please!

IP: Logged

Dawn
Forum Contributor

Posts: 245
From:St. Marys, PA
Registered: Sep 98

posted 17 January 2000 08:48 PM     Click Here to See the Profile for Dawn   Click Here to Email Dawn     Edit/Delete Message   Reply w/Quote
You're too easy

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!