The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  FMEA and Control Plans
  another solution

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   another solution
Csaba
Forum Contributor

Posts: 13
From:
Registered: Feb 2000

posted 16 May 2000 02:32 AM     Click Here to See the Profile for Csaba   Click Here to Email Csaba     Edit/Delete Message   Reply w/Quote
Is there any same solution instead of FMEA?

------------------

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 16 May 2000 07:45 PM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
An FMEA is a risk analysis. Any risk analysis system will work but most are an FMEA 'at heart', such as a hazardous operations study for processes involving explosives. They don't call it an FMEA but it is.

What are you trying to do? Why do you want avoid an FMEA. They are (in my opinion) a great tool which can save lots of $$$ in the long run.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!