![]() FMEA and Control Plans
![]() another solution
|
| next newest topic | next oldest topic |
| Author | Topic: another solution |
|
Csaba Forum Contributor Posts: 13 |
Is there any same solution instead of FMEA? ------------------ IP: Logged |
|
Marc Smith Cheech Wizard Posts: 4119 |
An FMEA is a risk analysis. Any risk analysis system will work but most are an FMEA 'at heart', such as a hazardous operations study for processes involving explosives. They don't call it an FMEA but it is. What are you trying to do? Why do you want avoid an FMEA. They are (in my opinion) a great tool which can save lots of $$$ in the long run. IP: Logged |