The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  FMEA and Control Plans
  Control Plans

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Control Plans
KAVOSH
unregistered
posted 17 May 2000 07:48 AM           Edit/Delete Message   Reply w/Quote
Hi everybody,

Anyone knows how to distinguish controls done by operators and controls done by QC in control plans?

Your help is appriciated.
KAVOSH

IP: Logged

Spaceman Spiff
Forum Contributor

Posts: 64
From:FL
Registered: Mar 99

posted 17 May 2000 08:07 AM     Click Here to See the Profile for Spaceman Spiff   Click Here to Email Spaceman Spiff     Edit/Delete Message   Reply w/Quote
I usually document who does the check under the "Control Method" column, i.e., "Operator - Record set-up on checklist and on-going X-bar & R chart. QC - Review SPC chart and in-process inspection."

Hope that helps.

IP: Logged

KAVOSH
unregistered
posted 17 May 2000 03:07 PM           Edit/Delete Message   Reply w/Quote
SpaceMan

Thanks a lot. Hope to be of some help to you someday.
KAVOSH

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!