The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  FMEA and Control Plans
  FMEA detail

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   FMEA detail
John McCarthy
Lurker (<10 Posts)

Posts: 1
From:Ireland
Registered: Jun 2000

posted 22 June 2000 12:27 PM     Click Here to See the Profile for John McCarthy   Click Here to Email John McCarthy     Edit/Delete Message   Reply w/Quote
Hi there,

We've recently had a QS9000 pre-registration audit and one of the areas we were pulled up on was the level of detail on our FMEAs. We are an Electronics Manufacturing company (both Surface mount & Plated through hole PCB technology) and had tackled FMEAs purely from a process viewpoint i.e. we examined the process of assembling PCBs from SMT placement machines, reflow ovens through to manual assembly, solderwave, test etc. The auditor in question felt these were too lightweight and that we should be getting into alot more detail such as the effect of different processes on individual components on the PCB assemblies. Our problem is that we manufacture a vast number of different products for alot of customers who are not automotive (and don't require QS9000) and if we were to go into that detail on all our products, we'd spend the rest of our lives doing FMEAs. From your experience, is the auditor correct here or is he going over the top? I always felt with Process FMEAs that it was the manufacturing process that needed to be investigated.

Any feedback is much appreciated !!

John.

------------------

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 24 June 2000 06:20 PM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
quote:
Originally posted by John McCarthy:
we were pulled up on was the level of detail on our FMEAs
I'd have to see your FMEAs, but I am not convinced your auditor can determine for you the level of detail 'required'. Did s/he write you up or what?

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!