I understand the desirability and importance of having the DFMEA on hand when preparing a PFMEA. However, is it an absolute requirement? Can you reasonably expect to be able to complete a PFMEA without access to the design? IMHO, since design changes are not meant as fixes for PFMEAs, all is not lost just because we don't have a design. What say you all IP: Logged |
|
Marc Smith Cheech Wizard Posts: 4119 |
Nope - the requirement is not 'absolute'. Many times a non-design responsible supplier cannot get a DFMEA from their customer. IP: Logged |
|
Howard Atkins Forum Wizard Posts: 202 |
I would say most times the DFMEA is not available. IP: Logged |
|
Marc Smith Cheech Wizard Posts: 4119 |
You're right. I was being overly optimistic using the word 'many' instead of 'most'. IP: Logged |
|
Amex Lurker (<10 Posts) Posts: 3 |
Thank you!! IP: Logged |