|
This thread is carried over and continued in the Current Elsmar Cove Forums
|
The New Elsmar Cove Forums
|
The New Elsmar Cove Forums
![]() FMEA and Control Plans
![]() CONTROL METHOD IN THE CONTROL PLANS
|
| next newest topic | next oldest topic |
| Author | Topic: CONTROL METHOD IN THE CONTROL PLANS |
|
T.P.NAMASIVAYAM Lurker (<10 Posts) Posts: 6 |
1) CAN ANYBODY EXPLAIN ABOUT THE "CONTROL METHOD" MENTIONED IN THE CONTROL PLAN. 2) IF 100% INSPECTION IS CARRIED OUT FOR A CHARACTERISTICS WHAT SHOULD BE THE CONTROL METHOD? IP: Logged |
|
Al Dyer Forum Wizard Posts: 622 |
quote: There are really two types of control methods for control plans and FMEA, prevention control and detection control. Your 100% inspection would be a "detection" control method for your characteristic. A type of preventive control method might be an auto detect and reset for tool wear. ASD... [This message has been edited by Al Dyer (edited 07 April 2001).] IP: Logged |
All times are Eastern Standard Time (USA) | next newest topic | next oldest topic |
![]() |
Hop to: |
Your Input Into These Forums Is Appreciated! Thanks!
