  4.5 Engineering Change record of implementation into production

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   4.5 Engineering Change record of implementation into production
kennyq
unregistered
posted 14 June 2000 11:12 PM           Edit/Delete Message   Reply w/Quote
What exactly are the looking for when they ask for record of engineering change into production. My company seems to think they are talking about the PPAP date. I don't think so, I think they mean what it says "actual implementation into production"

IP: Logged

Andy Bassett
Forum Contributor

Posts: 274
From:Donegal Ireland
Registered: Jun 1999

posted 23 June 2000 02:23 AM     Click Here to See the Profile for Andy Bassett   Click Here to Email Andy Bassett     Edit/Delete Message   Reply w/Quote
Hello Kennyq

Doesnt look like you got an answer to your question, and i dont think that i am going to help you much (PS have another go at rephrasing it, maybe you will connect with someone out there).

As an aside, an auditor once told me that he checks the health of a company in 10 minutes by REVIEWING THEIR ENGINEERING CHANGE SYSTEM.

I didnt really read too much into this at the time, but the more i see the more i think it is true. I guess it is because many companies concentrate on getting products manufactured and out of the door, at the expense of working to consequential/disciplined procedures. In most companies an Engineering Change involves a lot of small detailed work that nobody wants to take on and ensure it is done. In my environment (Motorsport) this is deadly. Stores are not asked to scrap or rework parts, customers are not informed about changes, suppliers are not informed about changes to open orders etc.

In one company where i am now we have developed an Excel spreadsheet, where the changes are noted and we have developed a number system for the necessary changes, of which there are 16 POSSIBILITIES, ie Possibility Number 3 - Send new drawing to supplier etc. The relevant Project Manager is responsible to ensure that all these activities are done, and only then can he close the point.

Coming back to your question, i think you are being asked how the outcomes from your Engineering Change System is actioned.

Come back to use if you dont have what you want

Regards


------------------
Andy B

[This message has been edited by Andy Bassett (edited 23 June 2000).]

IP: Logged

Laura M
Forum Contributor

Posts: 299
From:Rochester, NY US
Registered: Aug 1999

posted 23 June 2000 07:17 AM     Click Here to See the Profile for Laura M   Click Here to Email Laura M     Edit/Delete Message   Reply w/Quote
I was always told it was the date of implementation in production. The best control I had at a large company was updated paper work with the engineering change level and the effective date of change. Still PPAP documentation, and I think the Source warrant documented the effective date.

IP: Logged

Jim Biz
Forum Wizard

Posts: 275
From:ILLINOIS
Registered: Mar 2000

posted 23 June 2000 07:22 AM     Click Here to See the Profile for Jim Biz   Click Here to Email Jim Biz     Edit/Delete Message   Reply w/Quote
Just 2Cnts worth: we're 9002 - don't deal with design changes but it could be close to what we do with "contract/blueprint ammendment" changes that come along.

Can't be sure but the way the question reads but I would think that a "master log" of what changes were officially approved and what date they were released would cover it.

Regards
Jim

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 24 June 2000 05:38 PM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
You manufacture a lot. You implement a change. You have to record the lot number of the last of the old 'design' and the 1st lot of the 'new design'. It has nothing to do with the PPAP date. Your interpretation is correct.

IP: Logged

Dawn
Forum Contributor

Posts: 245
From:St. Marys, PA
Registered: Sep 98

posted 24 June 2000 08:57 PM     Click Here to See the Profile for Dawn   Click Here to Email Dawn     Edit/Delete Message   Reply w/Quote
During our assessment audit, this question came up and what we did to fix it was: When htere is an engineering (print,drawing) change, we mark up the print change documentation for the date it first went into production and an order was completed.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!