Hi! I work in a two tired company of automotive industry. We make metallic stamp parts. Our lots are no bigger then 20,000 parts, and after that the tool is maintained. After an audit, the auditor tell me that in a Product audit we have to measure at list tree parts. I think that one is enough. Can you give me your opinions? Thanks in advance. IP: Logged |
|
Jim Biz Forum Wizard Posts: 275 |
Just Opinion: More parts measured is More YOU KNOW about.. the Tool - Maintainence Results and the Process. One may-be not enough - 3 MAY-be enough - 5 would be "better" How often do you audit the product?" IP: Logged |
|
Marc Smith Cheech Wizard Posts: 4119 |
What product audit? Was the auditor talking about a dock audit? Your in-process audit(s) is(are) defined by your control plan (or equivalent). You say you check 1 part. When? 1 part out of a run of 20,000? IP: Logged |
|
Natalia Botelho Lurker (<10 Posts) Posts: 3 |
Thanks for the tips. Yes, Iām talking about dock auditās which are made once a year, minimum. They are independent of the control made during production, which have a bigger sample and is made each hour, as defined in the Control Plan. Natalia IP: Logged |
|
Marc Smith Cheech Wizard Posts: 4119 |
See these threads for some info on Dock Audits: https://elsmar.com/ubb/Forum1/HTML/000037.html and https://elsmar.com/ubb/Forum1/HTML/000100.html and https://elsmar.com/ubb/Forum1/HTML/000242.html [This message has been edited by Marc Smith (edited 20 April 2000).] IP: Logged |