  Auditing
  Objective evidence for covering all shifts and locations

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Objective evidence for covering all shifts and locations
Douglas E. Purdy
Forum Contributor

Posts: 14
From:Schiller Park, IL
Registered: Jul 2000

posted 19 January 2001 02:31 PM     Click Here to See the Profile for Douglas E. Purdy   Click Here to Email Douglas E. Purdy     Edit/Delete Message   Reply w/Quote
Have gone through the first follow-up of a QS Audit, and one of the items addressed was how to prove that all shifts and locations are covered. We have two facilities and the number of shifts vary at one location, based on amount of business. I would like some ideas as to how others address this lack of evidence.

IP: Logged

ml retcher
Forum Contributor

Posts: 22
From:usa
Registered: Jun 99

posted 19 January 2001 02:40 PM     Click Here to See the Profile for ml retcher   Click Here to Email ml retcher     Edit/Delete Message   Reply w/Quote
I simply have a sign off sheet for each person that was audited to sign off. We have a column to sign what shift this person was on when audited, area they were working in when audited, and date of the audit.

IP: Logged

Alf Gulford
Forum Contributor

Posts: 60
From:Portland, OR
Registered: Aug 2000

posted 23 January 2001 12:31 PM     Click Here to See the Profile for Alf Gulford   Click Here to Email Alf Gulford     Edit/Delete Message   Reply w/Quote
This was something I've never thought about but since my auditors fill out an audit report for every interview, I could just add a block for the time the interview was started. Seems simple and straightforward. Am I missing something?

Alf

IP: Logged

Douglas E. Purdy
Forum Contributor

Posts: 14
From:Schiller Park, IL
Registered: Jul 2000

posted 23 January 2001 01:12 PM     Click Here to See the Profile for Douglas E. Purdy   Click Here to Email Douglas E. Purdy     Edit/Delete Message   Reply w/Quote
The parts you are missing are:

1)I do not want to add another document to the System;
2)The QSA Checklist that we use would show what location was audited, but not the Shift. The QSA Checklist does not readily identify the shift information;
3)I do not intend making it a requirement to include this information for all observations made. I can audit a shift without having to document specific and/or detailed observations. (Yes, I am interested to know what may be done differently and if the issue is shift specific. But if not do I have to give detailed observations? My experience would say no.)

My current thought is to establish in the procedure flow that the assignments ensure that all shifts and locations are covered and when statusing the Annual Audit Schedule the Responsible Party shall check a field that all shifts and locations were audited.

Any feedback?

IP: Logged

donnammurphy
Forum Contributor

Posts: 18
From:Athens, GA, USA
Registered: Dec 2000

posted 23 January 2001 01:51 PM     Click Here to See the Profile for donnammurphy   Click Here to Email donnammurphy     Edit/Delete Message   Reply w/Quote
I include the shift to be audited in the scope of the audit when it is orginally scheduled. I have auditors who only work 2nd and 3rd shifts, therefore I try and utilize them as much as possible. By including this in the scope of the audit, they are aware of the shift to be audited, plus I can pull the internal auditing records and show an auditor. I don't believe the standard states that you must "document" that you audit in all shifts, but that all shifts must be covered. Hope this helps...Donna

IP: Logged

Doug
Lurker (<10 Posts)

Posts: 5
From:Neenah Wi Winnibago
Registered: Jan 2001

posted 02 February 2001 01:01 PM     Click Here to See the Profile for Doug   Click Here to Email Doug     Edit/Delete Message   Reply w/Quote
Our Audit Report Cover Sheet has a field for information pertaining to the audit to include the Auditor, Audited Area, Auditee, Audit Date, and SHIFT. If the audit overlaps from one shift to another, we enter 1/2, 2/3, or 3/1. If that would not work for you, enter the "Start" time and the "Finish" time. Just my thoughts.

IP: Logged

Douglas E. Purdy
Forum Contributor

Posts: 14
From:Schiller Park, IL
Registered: Jul 2000

posted 02 February 2001 03:03 PM     Click Here to See the Profile for Douglas E. Purdy   Click Here to Email Douglas E. Purdy     Edit/Delete Message   Reply w/Quote
Thanks for the examples, ideas, and recommendations. I'll see what the next follow-up brings.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!