|
This thread is carried over and continued in the Current Elsmar Cove Forums
|
The New Elsmar Cove Forums
|
The New Elsmar Cove Forums
![]() ISO 9001/4:2000
![]() Supplier Assesment
|
| next newest topic | next oldest topic |
| Author | Topic: Supplier Assesment |
|
Carl Redman Lurker (<10 Posts) Posts: 6 |
Can anyone suggest a means of evaluating a suppliers performance, when the supplier is the only supplier in the region. Do we still have to go through the motions? Carl IP: Logged |
|
CarolX Forum Contributor Posts: 108 |
Carl, You still need to address that situation in your procedures. This how I did it. Vendor approval: 2.3 VENDORS SHALL BE APPROVED BY ONE OR MORE OF THE FOLLOWING METHODS:
5.2 THERE MAY BE VENDORS THAT ARE SOLE SOURCE FOR SUPPLIES OR SERVICES WHICH HAVE BELOW STANDARD VENDOR RATING. AFTER ALL OTHER AVENUES OF CORRECTIVE ACTION HAVE BEEN EXHAUSTED, WE MAY REVERT TO 100% INSPECTION AND ALL OTHER CORRECTIVE ACTION MEASURES SHALL BE SUSPENDED. Hope this helps, [This message has been edited by CarolX (edited 18 April 2001).] IP: Logged |
|
energy Forum Contributor Posts: 228 |
Carol X, I copied the entire post and added it to my "Supplier" reference files. I'll use it. I'm not proud. Thanks energy IP: Logged |
|
CarolX Forum Contributor Posts: 108 |
energy, NP - I am sure I "borrowed" that section from someone else. CarolX IP: Logged |
|
Al Dyer Forum Wizard Posts: 622 |
The Elsmar Cove is probably the Napster of the "quality" world! Wouldn't do without it! (Hope the boss isn't surfing the forums today) ASD... IP: Logged |
All times are Eastern Standard Time (USA) | next newest topic | next oldest topic |
![]() |
Hop to: |
Your Input Into These Forums Is Appreciated! Thanks!
