The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  ISO 9001/4:2000
  Price and Cost

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Price and Cost
mseiedi
Lurker (<10 Posts)

Posts: 1
From:
Registered: May 2001

posted 22 May 2001 04:32 PM     Click Here to See the Profile for mseiedi   Click Here to Email mseiedi     Edit/Delete Message   Reply w/Quote
In ISO 9000:2000 there is a defenition for quality characteristic as follow:
quality characteristic

inherent characteristic (3.5.1) of a product (3.4.2), process (3.4.1) or system (3.2.1) related to a requirement

(3.1.2)

NOTE 1 Inherent means existing in something, especially as a permanent characteristic.

NOTE 2 A characteristic assigned to a product, process or system (e.g. the price of a product, the owner of a product) is not a

quality characteristic of that product, process or system.

I accept that price is a contractual char. and is not inherent so it can not be a quality characteristic. BUT what for COST? I think that Cost is inherent characteristic while one can add to this cost in order to establish a PRICE. On the other hand we use some Quality Engineering Techniques such as Value Engineering as a tool to improve a product(Is it a Quality Improvement or not? It is a Question too.).

The same problem rise for DELIVERY DATE and MAKE SPAN. As delivery date of a Product/Service is determined by contract so it is not inherent Char. and is not Quality Characteristic. BUT make span depends on our manufacturing process, way of service preparation and so, that can be viewd as inherent characteristic. MOTOROLLA has reduced make span of pagers about 70 minutes in 1986 for six-sigma, As you know, and improved its efficiency.

So I wish to have your opinion about COST & MAKE SPAN. Are they Quality Characteristics or a seprate Characteristics which shall not be mixed with Quality Characteristic.


IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 03 June 2001 05:17 PM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
I don't think you can categorize Cost as a quality factor. An old saying is you cannot always equate cost with the quality of a product. That is, the most expensive one is not always the 'better' one (equating 'better' with 'quality').

On the other hand, one could probably provide an arguement for inclusion. I can't.

As far as Make Span - I'm interpreting Make Span as Time to Manufacture. I don't see that as a 'quality' characteristic, either.

-> As delivery date of a Product/Service is determined by
-> contract so it is not inherent Char. and is not Quality
-> Characteristic.

I could make an arguement where Delivery Date could be a 'quality' characteristic of some service industries. An example would be where you advertise a service within a certain time frame. I know some repair shops which advertise that they will respond within 4 hours. Part of the problem here is what is your definition of quality. There are hundreds of definitions. Most often you will see a difference based upon exactly what it is we're talking about. In addition, reconciling what the customer percieves as 'quality' characteristics with what the supplier percieves as 'quality' characteristics is not always as easy as it sounds.

IP: Logged

E Wall
Forum Contributor

Posts: 45
From:Columbus, GA USA
Registered: Jun 2001

posted 12 June 2001 05:33 PM     Click Here to See the Profile for E Wall   Click Here to Email E Wall     Edit/Delete Message   Reply w/Quote
If you identify Cost as a list of what is included but not $ amount, I believe it would apply (i.e. components, services, scrap, processing activities, rework, etc...)
wouldn't it?

Hey, I finally made it past 'Lurker'!

[This message has been edited by E Wall (edited 12 June 2001).]

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!