  ISO 9000:1994
  A Question of Authorization

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   A Question of Authorization
The Fixer
Forum Contributor

Posts: 18
From:South Bend, IN, USA
Registered: Mar 99

posted 29 September 1999 07:46 PM     Click Here to See the Profile for The Fixer   Click Here to Email The Fixer     Edit/Delete Message   Reply w/Quote
We hold regular QAT (Quality Action Team) meetings with customers and OEM's for which we act as an authorized repair vendor.
One of these OEM's requires that all test equipment used for final acceptance of any of their products be calibrated at six month intervals. (The normal cycles are one year to eighteen months)
While researching the source of this requirement recently, I found that the only documented evidence was an Action Item in an old QAT Register.
My question is this. Is an Action Item resulting from a meeting proper authorization for making a significant change in standard policy ? Shouldn't the OEM have been required to either submit an addendum to the contract or at least provide some formal writing ?
OR, is our QAT meeting a valid medium through which system changes can be made based on a customer request ?

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 29 September 1999 11:39 PM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
You've lost me. You say a customer requires a 6 month calibration cycle. You state a 'normal' cycle is 1 year to 18 months. I'm not sure what you mean by 'normal'. Calibration cycles are determined by use, etc. Any time you require a more frequent calibration than use, etc. requires, it's surely not a 'problem'. As far as whether such a meeting is 'proper authorization' - that depends upon your company calibration system. Annotate your calibration database record to indicate the reason for the shortened cycle. Also consult NCSL's RP-1 re calibration cycles.

The meeting should be satisfactory 'authorization' to shorten a cycle. Lengthening the cycle would be a problem.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!