The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  ISO 9000:1994
  4.5 Doc. Control and Shop Aids

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   4.5 Doc. Control and Shop Aids
Jim H
Lurker (<10 Posts)

Posts: 1
From:
Registered: Jan 2000

posted 12 January 2000 04:35 PM     Click Here to See the Profile for Jim H   Click Here to Email Jim H     Edit/Delete Message   Reply w/Quote
Do shop aids need to be controlled under 4.5 other than to mark them "Shop Aid" and document that shop aids are not controlled? By shop aid I mean a drawing that is "marked up" by an operator so that he may perform his job more efficiently. As long as he does not change the intent of the drawing and uses it to highlight important areas.

IP: Logged

David Mullins
Forum Contributor

Posts: 248
From:Adelaide, South Australia, Australia
Registered: Nov 1999

posted 12 January 2000 06:00 PM     Click Here to See the Profile for David Mullins   Click Here to Email David Mullins     Edit/Delete Message   Reply w/Quote
What if I spent may hours writing a procedure for a critical activity, and then gave a copy of the procedure to the one person who was going to use it but I didn't bother to control the document, would I have a 'quality system'?
I would say not. The poor person performing the task is relying on the fact he has the correct and latest data - if the drawing is not controlled how can we prove that he has?
I would expect that the drawing number and issue status is controlled by the drawing office.
The term "marked-up" worries me. If marking-up involves any changes to the numbers or specifications on the drawing, then the marked-up copy needs to be returned to the drawing office so that the drawings can be updated to a current state. If you didn't do this, firstly your inspector (presuming some form of checking by yourself or customer)would hit the wall because things don't match, secondly if you gave the non-updated original drawing to another operator and said make this thing, you will not get an identical product.
All of this raises the potential for questioning the design approval process and much more!

------------------

IP: Logged

barb butrym
Forum Contributor

Posts: 637
From:South Central Massachusetts
Registered:

posted 12 January 2000 08:27 PM     Click Here to See the Profile for barb butrym   Click Here to Email barb butrym     Edit/Delete Message   Reply w/Quote
someone needs to authorize the mark ups, and it must be clear to anyone what the original drawing and revision is..typically an initial and date label is enough...a procedure for local control allowing this needs to be in place. I see your question as highlights, color coding, operator specific stuff..not global...am I right?

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 12 January 2000 08:57 PM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
The original is controlled, correct? So - if it changes (officially) it will be replaced. As is noted above, the question is "What is marked?" If the operator, for example, makes notes on the document which do not change the document (such as dimensions) I see no problem. The auditor is going to be suspicious, however, and ask questions: "Why does the operator need to mark up drawings with....?" "If it's important enough for the operator to mark up the document, should those markups not be officially added?"

If you can provide a decent answer, you should be OK. I see this quite a bit in machine shops where operators make notes on prints quite often. The print is controlled, however, so the print (or other document) had best be the latest release.

Barb said: "...someone needs to authorize the mark ups..." which is true if any criteria is changed. I might also discuss the 'markups' with the operator to see just why s/he puts the markups there and whether communication is maintained. If the operator indicates s/he 'needs' the markups, I would have questions about the adequacy of the document in and of its self.

A last thought is consideration as to whether operators take info from one controlled document and put it on another - which I see quite often. In that case there is a problem. If the derivitive document (from where the info came from) changes there is no guarantee that the note(s) on the receiving document will be changed - which is obviously a problem.

Just some thoughts.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!