The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  ISO 9000:1994
  Document and Data Changes

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Document and Data Changes
Vash Stampede
Forum Contributor

Posts: 20
From:
Registered: Nov 2000

posted 18 December 2000 06:02 PM     Click Here to See the Profile for Vash Stampede   Click Here to Email Vash Stampede     Edit/Delete Message   Reply w/Quote
On Item # 5.3 Document and Data Changes:
Changes to documents and data will be reviewed and approved by the same functions/organizations that performed the original review and approval, unless specifically designated otherwise. The designated functions/organizations will have access to pertinent background information upon which to base their review and approval.
Where applicable, the nature of the change shall be identified in the document or the appropriate attachment.
1. Is it referring that for example, "I came from engineering department, whenever I made changes on the document, I shall be issuing an ECN (Engineering Change Notice), then it shall be approved (all department heads) and not within the same organization, 2. Am I not violating this item 5.3? Please comment. 3. Does it mean 'within the same organization/function' >>>>within the same department? PLease advice.
Thanks,
Vash Stampede
[email protected]

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 19 December 2000 02:45 PM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
> Changes to documents and data will be reviewed and approved by the same
> functions/organizations that performed the original review and approval,
> unless specifically designated otherwise.

To put it simply, if you are responsible for it (you wrote it) it's yours. Adding other reviews and or approvals from other people and/or departments is not a problem as long as the responsible person/department also reviews it. Typically the 'ultimate' approval is the province of the responsible person/department.

Have I confused the issue or does this answer your question?

[This message has been edited by Marc Smith (edited 19 December 2000).]

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!