The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  ISO 9000:1994
  Why identify conforming products?

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Why identify conforming products?
Madhu Pentamsetty
unregistered
posted 02 April 2001 03:16 PM           Edit/Delete Message   Reply w/Quote
In my company we identify the status of non-conforming products with red tags. The status of conforming products is not identified. Does "4.12 Inspection and Test Status" require us to identify the conforming products also? Can I write the procedure as....äonly non-coforming products are identified..all other unidentified inspected products will be considered to be conformingä?

IP: Logged

Laura M
Forum Contributor

Posts: 299
From:Rochester, NY US
Registered: Aug 1999

posted 02 April 2001 04:23 PM     Click Here to See the Profile for Laura M   Click Here to Email Laura M     Edit/Delete Message   Reply w/Quote
This requirement is more at identifying whether or not product has been tested. Some products go through several phases of manufacturing and testing. If product is In-process, you need to know if its been tested or not. Obviously product that has failed will be identified as rejected, but how do you ensure it all gets tested?

I suppose there are other reasons, but this is usually the most obvious.

Laura

IP: Logged

Al Dyer
Forum Wizard

Posts: 622
From:Lapeer, MI USA
Registered: Oct 2000

posted 02 April 2001 06:07 PM     Click Here to See the Profile for Al Dyer   Click Here to Email Al Dyer     Edit/Delete Message   Reply w/Quote
Agree,

All product has to be identified, usually through some type of traveller or job sheet that notes basic product information and that the previous operation has been completed and the product is waiting to be moved to a subsequent operation.

Auditors live to find a carton or bin of unidentified material, probable because if a company can't control such a visible aspect of the system (especially on audit day!) there are probably further failures.

ASD...

IP: Logged

Dan Larsen
Forum Contributor

Posts: 137
From:Sussex, WI
Registered: Feb 2001

posted 03 April 2001 12:09 AM     Click Here to See the Profile for Dan Larsen   Click Here to Email Dan Larsen     Edit/Delete Message   Reply w/Quote
quote:
Originally posted by Madhu Pentamsetty:
In my company we identify the status of non-conforming products with red tags. The status of conforming products is not identified. Does "4.12 Inspection and Test Status" require us to identify the conforming products also? Can I write the procedure as....äonly non-coforming products are identified..all other unidentified inspected products will be considered to be conformingä?

Consider the situation where someone "forgets" to red tag the nonconforming product. If there were to be any default, I would think that unidentified material should be considered nonconforming. Except that then the standard says it must be identified.

Bottom line...tag/identify both good and bad (and I fully agree that the traveler or router for acceptable product is sufficient identification).

IP: Logged

Don Watt
Forum Contributor

Posts: 70
From:Notts,United Kingdom
Registered: Mar 2000

posted 03 April 2001 09:26 AM     Click Here to See the Profile for Don Watt   Click Here to Email Don Watt     Edit/Delete Message   Reply w/Quote
I'd be interested to know how others identify conforming product in a one piece flow situation.

e.g. several distinct operations in a manufacturing cell, with product on all stations.

IP: Logged

energy
Forum Contributor

Posts: 228
From:New Britain, CT
Registered: Nov 2000

posted 03 April 2001 11:56 AM     Click Here to See the Profile for energy   Click Here to Email energy     Edit/Delete Message   Reply w/Quote
Our GM asked a consultant if it would be permissable to consider all material in bins and on racks in our distribution division, which are labeled with identification only, as acceptable product. Because our incoming inspection deemed the material acceptable, it would be permissable to state that all discrepant material is quarantined for disposition and that all acceptable material is placed in bins or stored on racks. I listened and don't have that confidence that it will fly. But, we will see, won't we?

IP: Logged

Alf Gulford
Forum Contributor

Posts: 60
From:Portland, OR
Registered: Aug 2000

posted 03 April 2001 01:33 PM     Click Here to See the Profile for Alf Gulford   Click Here to Email Alf Gulford     Edit/Delete Message   Reply w/Quote
Although I get a little nervous about it sometimes, our position is that, unless they're identified as non-conforming, our thousands of different parts are considered good.

This system has passed muster with a couple of different registrars. Every employee they talked to knew how to answer the question and was able to explain how to handle non-conforming parts.

This may not work for everyone, but it can work.

Alf

IP: Logged

Dan Larsen
Forum Contributor

Posts: 137
From:Sussex, WI
Registered: Feb 2001

posted 03 April 2001 03:15 PM     Click Here to See the Profile for Dan Larsen   Click Here to Email Dan Larsen     Edit/Delete Message   Reply w/Quote
I am guessing here, but I suspect that in each of the last three posts inspection status of the material as conforming is covered. Remember that "conformance" can be demonstrated by appropriate signoffs on routers, ID tags, etc.

Don, most cells I've seen track production somehow, either by time on a container or by individual SN if the part is big enough. I'd also assume you have in process controls/inspection to capture conformance. Therefore, for the work in process (at each station) the assumption is that it conforms until proven otherwise, and this would be addressed by traceable process control/inspections for the parts that are produced (assuming, of course, that they are ID'ed as they come out of the cell.

For the stock on the shelf, as Energy reports, the stock is ID'ed. Again, I don't see a problem. Upon receipt, there is an "either/or" tagging situation involved. The only time I get nervous is when one of the situations involves NO tag...face facts, people do forget. Of course, if the stock ID is traceable to an inspection record, that's even better.

As for Alf's case, the only question I have is...are the containers of "good" product identified? As in Energy's situation, if the containers are identified, then you have an "either/or" tagging system. If they aren't identified at all, I see that as a violation of 4.8.

What got me nervous on the original post was the suggestion that the parts wouldn't be identified at all (not an uncommon problem in a small company with a limited type of product).

IP: Logged

Laura M
Forum Contributor

Posts: 299
From:Rochester, NY US
Registered: Aug 1999

posted 03 April 2001 03:24 PM     Click Here to See the Profile for Laura M   Click Here to Email Laura M     Edit/Delete Message   Reply w/Quote
Identification is required by 4.8 ORiginal question was Inspection and TEst status. Most companies handle together, but to get at the first post, product ID is the "what is it?" Inspection Status is "how is it."

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!