|
This thread is carried over and continued in the Current Elsmar Cove Forums
|
The New Elsmar Cove Forums
|
The New Elsmar Cove Forums
![]() APQP and PPAP
![]() Quality plan
|
| next newest topic | next oldest topic |
| Author | Topic: Quality plan |
|
mibusha Forum Contributor Posts: 60 |
We design and build welding assemblies, hemmer assemblies and fastening systems. As a TE supplier we are registering to ISO 9001 TE with a pre-assessment in January,99. We have been doing Control Plans and FMEAs (actually catching up on them with a combination of workshops and classes). I know we have to have a quality plan and we have to design in R&M. Basically I am using pages 2-2 through 2-5 in the R&M Guidelines (SAE). My question is: What form or format does the quality plan and/or R&M take? Do all five stages appear on a Gantt chart? Must I document, for example, LCC calculations? Or should I write the procedure (our quality plan and/or R&M)in text form and note each document as it is mentioned in the text? We do most of the TE requirements but have not done a good job of documenting them. As you can see I could use some advice on this. Any help would be appreciated. Thanks, IP: Logged |
|
Howard Atkins Forum Wizard Posts: 202 |
I am afraid that I do not know anything about this. I will post also at the TE forum . Can anyone help? IP: Logged |
|
Marc Smith Cheech Wizard Posts: 4119 |
My experience with Quality Plans ranges from product specific plans to general design & development plans. In the ISO and QS world a 'quality plan' can be a series of systems, if you will. That is to say I don't always see a specific written 'quality plan' per se. In QS it is your APQP system and related events. Yup - Design and Process FMEAs, control plans, flow diagrams, design reviews, verification, validation - all these together form your 'quality plan' in adduition to other things you do (eg: Quality Function Deployment, customer surveys, how nonconforming product is handled [yes - production features may be a part] etc.). As long as you can show equivalances in your systems to the 'phases', you should be in gear. I can't speak to the R&M issue. IP: Logged |
All times are Eastern Standard Time (USA) | next newest topic | next oldest topic |
![]() |
Hop to: |
Your Input Into These Forums Is Appreciated! Thanks!
