  APQP and PPAP
  PPAP and Waivers

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   PPAP and Waivers
Tom Avrutik
Lurker (<10 Posts)

Posts: 3
From:
Registered: Oct 98

posted 29 January 1999 11:59 AM     Click Here to See the Profile for Tom Avrutik   Click Here to Email Tom Avrutik     Edit/Delete Message   Reply w/Quote
We are a tier 2 supplier working to be registered to QS 9K, and I am frequently asked about several issues regarding waivers:

1. Can a customer waive ALL "QS" requirements? This approach has great favor with Marketing, but leaves me uneasy.

2. We have several plants overseas, but we are the design center. If we design a product, but it will be built and sold only overseas, do we have to follow APQP and have all the PPAP documents on hand, even if the overseas customers don' t require (or care about) QS?

3. If piece part or sub-assembly manufacturing is subcontracted, do we need control plans, FMEA's etc from all the suppliers to support our PPAP package? We have some suppliers that might refuse to make parts if we require this.

4. To what extent must we have PPAP documentation on existing products that are sold to customers that don't require QS 9000?

Any clarification would be greatly appreciated.

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 05 February 1999 09:25 PM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
--> ...1. Can a customer waive ALL "QS" requirements? This approach has
--> great favor with Marketing, but leaves me uneasy.

They can, for themselves, waive all requirements I suppose. If you supply hoses for automotive and ropes for a non-automotive client you do not have to go through APQP or PPAP or anything else for the non-automotive customer.

--> 2. We have several plants overseas, but we are the design center. If
--> we design a product, but it will be built and sold only overseas, do
--> we have to follow APQP and have all the PPAP documents on hand, even
--> if the overseas customers don' t require (or care about) QS?

The only thing that matters is if the customer requires it. If it's Ford, GM or Chrysler, or if your customer requires it, you have no choice.

--> 3. If piece part or sub-assembly manufacturing is subcontracted, do
--> we need control plans, FMEA's etc from all the suppliers to support
--> our PPAP package? We have some suppliers that might refuse to make
--> parts if we require this.

If your customer requires you to provide sub-supplier documentation, you have no choice.

--> 4. To what extent must we have PPAP documentation on existing
--> products that are sold to customers that don't require QS 9000?

There is no requirement for you to do QS anything if you are not required to specifically by your customer. If some of your products are automotive, you will probably be required to be QS9000 (actually ISO9001) registered.

HOWEVER - The ISO9001 requirements apply to ALL your products/systems. PPAP and APQP (per se) are not required by ISO9001.

IP: Logged

Batman
Forum Contributor

Posts: 111
From:Kane, PA 16735
Registered:

posted 07 February 1999 12:12 PM     Click Here to See the Profile for Batman   Click Here to Email Batman     Edit/Delete Message   Reply w/Quote
But Marc, if your quality system conforms to QS9000, can you not do APQP? in your vast exposure to other qualitt systems, are you allowed to have two systems? One for automotive customers (or those that require PPAP submissions, etc.) and one for non-automotive customers (those that do not know PPAP, etc.)? I believe we were required to set our system up to always do APQP / PPAP, but if the particular customer does not require PPAP we just did not submit a PPAP. One was available, though.

IP: Logged

Howard Atkins
Forum Wizard

Posts: 202
From:Israel
Registered:

posted 08 February 1999 12:16 AM     Click Here to See the Profile for Howard Atkins   Click Here to Email Howard Atkins     Edit/Delete Message   Reply w/Quote
I believe that 2 systems are dangerous, there is always a chance of double standards and different operating procedures that cause confusion.
We are begining to get demands from non-automotive customers to supply a truncated form of PPAP.
To follow APQP can only help you from all points as the process is I believe helpfull and should be cost saving in the long run. The output of APQP is PPAP even if you do not transfer the whole documentation to the specific forms you have evidence that the process was completed.
We do not put all the output on standard forms but have tailored our procedures to allow us to us our own methods and just transfer when needed.
The method here will help to improve your performance and as such I would suggest to use it.

IP: Logged

canan
Lurker (<10 Posts)

Posts: 2
From:Turkey
Registered: Dec 98

posted 09 February 1999 06:19 AM     Click Here to See the Profile for canan   Click Here to Email canan     Edit/Delete Message   Reply w/Quote
trial

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 13 February 1999 07:27 AM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
I'm not advocating 2 systems. First let's agree PPAP is just a warrant you send in with APQP derived documents and data.

OK - your planning process is your planning process. Many now call it APQP. BUT - APQP is really inception of design through end of production. Do we agree on this?

That said, you can vary your planning requirements in accordance with need. This is to say maybe your automotive product is injection molded arm rests AND you have another product (non-automotive) which is injection molding toy soldiers. You will probably not be as critical on your design / verification / validation requirements with the toy soldiers as you will with the automotive arm rest you produce. You will probably not be as critical about your capability requirements for the toy soldier. In fact, you may not have any critical characteristics / requirements for the toy soldier.

Most of you systems will operate as usual - like contract review and purchasing. On the other hand, you management review will probably address arm rest issues in much more detail than any toy soldier issues.

Have I confused the issue or does this make sense to you... ??

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!