The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  APQP and PPAP
  PPAP for Electronics

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   PPAP for Electronics
Daryl MacNeil
Lurker (<10 Posts)

Posts: 3
From:Enfield, NS, CANADA
Registered: May 99

posted 06 May 1999 11:10 AM     Click Here to See the Profile for Daryl MacNeil   Click Here to Email Daryl MacNeil     Edit/Delete Message   Reply w/Quote
Hello all,
My company is an electronics manufacturer currently supplying a division of GM. The inclusion of PPAP requirements has been slowly mandated to us, but we are having some confusion as to the application of some of the elements.
The confusion involves the inclusion of dimensional data for items without true finished product dimensions (i.e. wiring harnesses) and how to determine which material specifications are required for a circuit card assembly (i.e. would we require material specifications for every resisitor on a card?)
We have asked our customer contact for some clarification, but any feedback on how to apply the PPAP requirements to electronics would be appreciated.

Thanks in advance,
Daryl

IP: Logged

Batman
Forum Contributor

Posts: 111
From:Kane, PA 16735
Registered:

posted 08 May 1999 11:40 PM     Click Here to See the Profile for Batman   Click Here to Email Batman     Edit/Delete Message   Reply w/Quote
PPAP is the final step of your project development, where you swear to have accomplished all features on a customer's specification or drawing. You have developed the process, the controls, the instructions; you purchased the correct raw materials for your assembly. The PPAP submission is verifying all this.

There must be some features or specifications that were required by the customer so he will purchase the items you are producing. The wiring harness, for example, must have some length requirement, or gage size, or something. These requirements must be verified and presented as either certifications with data (in the case of raw material supplied, for example, one of the requirements of QS9000) and / or data you generate from your manufacturing process. If you do APQP well, most of the information is ready by the time of PPAP submission.

But be sure to take the guidance of your customer. I do not have the PPAP manual here, but I think you may be required to have a level III for all new projects, but the actual submission may be a level I or II depending upon your customer's requirement. If APQP is done well, most of the required documentatiom is done as the project is brought on.

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 16 May 1999 07:01 AM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
Take a good look at the customer's stated requirements. Wire length, type of connector(s), etc. As far as dimensional issues, are there 'prints' of your finished product? Dimensional requirements would be (should be) defined there.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!