The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  APQP and PPAP
  APQP outside QS environment

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   APQP outside QS environment
BRoyal
Forum Contributor

Posts: 22
From:Charlotte, NC
Registered: Nov 98

posted 06 March 2000 08:11 PM     Click Here to See the Profile for BRoyal   Click Here to Email BRoyal     Edit/Delete Message   Reply w/Quote
Although I do not work in a QS environment, as an aerospace customer buying large machined parts I like the idea of my suppliers (job shops mainly)devloping some type of product quality plan before they start cutting metal.

How can I gently encourage my under-staffed suppliers to start developing such plans? I do not want to create a bureaucracy and tons of paperwork; I just want them to think a little bit before they start.

Thank you.

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 08 March 2000 10:30 PM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
I think it has less to do with 'encouragement' than the fact that you have to define and communicate what you consider your minimum requirements. Do you expect control plans? FMEAs or other risk tools? Be prepared to educate them in how to do what you want. Some companies don't know an FMEA from as SIC.

IP: Logged

Batman
Forum Contributor

Posts: 111
From:Kane, PA 16735
Registered:

posted 10 March 2000 08:39 AM     Click Here to See the Profile for Batman   Click Here to Email Batman     Edit/Delete Message   Reply w/Quote
You could "impose" PPAP type requirements, but a better approach is to show the value of a good APQP / PPAP system. Reduced waste, quicker due dates, less downtime, wtc., are all benefits of good planning. PPAP is simply a verification of the overall planning process from the process / product standpoint. Wouldn't it make sense to do this?

Or, if they cut steel for every new project on time and at 100% productivity, they likely don't need this. But then, as a supplier development person, you will be able to determine this.

I would think that once the value of a good APQP / PPAP system is demonstrated, it would become common to do it all the time.

What else does a company do in lieu of PPAP?

IP: Logged

Jarrod
Lurker (<10 Posts)

Posts: 2
From:Royal Oak, MI USA
Registered: Feb 2000

posted 13 March 2000 04:57 PM     Click Here to See the Profile for Jarrod   Click Here to Email Jarrod     Edit/Delete Message   Reply w/Quote
As a supplier of APQP software, most of our customers are in the automotive industry. However, some of our customers have found the methodology used can be adapted to any manufacturing environment, and real benefits can be seen from implementing an APQP system into their design/manufacturing processes.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!