The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  APQP and PPAP
  Capability Study ?

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Capability Study ?
1236 Paul
unregistered
posted 12 July 2000 09:30 AM           Edit/Delete Message   Reply w/Quote
I have just completed a level 3 ppap for a customer (first one I have done) and they are asking for a 100 peice capability study, I don't know what this is, can anyone steer me in the right direction. Thanks. Paul
Email me [email protected]

IP: Logged

billsfan
Forum Contributor

Posts: 19
From:Kane, Pa., USA
Registered: Aug 1999

posted 12 July 2000 10:45 AM     Click Here to See the Profile for billsfan   Click Here to Email billsfan     Edit/Delete Message   Reply w/Quote
Paul,
First, you'll need to know what characteristic(s) are "critical." In other words, what dimension are you to do a capability study on? Once that is established, you need to collect 100 samples (parts) to preform the study on. Now, you say that you've just completed the PPAP, so I'm assuming that production ran some quantity of parts. Let's hope that they ran at least 300 pieces, since that is the minimum required in the PPAP manual. You take your 100 pieces out of that production run. If possible, samples should be taken over time ( some from the beginning, middle & end of the run.) You then would measure the 100 pieces,(remembering the 10x rule.) At this point, I would enter the numbers into a software system which calculates & reports Cpk/Ppk information. If you don't have software, I guess you're going to have to do it the old fashion way, paper & pencil. Formulas can be found in the PPAP manual. You'll also need a Gage R&R for the piece of measuring equipment used for the study. In the future, might I suggest that PRIOR to the PPAP run, the "critical characteristics" are identified and a plan is established to collect data on the floor at the time of manufacturing (ie; xbar & r chart.) Then all you have to do is collect the data from manufacturing & crunch the numbers. Hope this has been of some help. If you give me more specifics, I might be able to "walk you through" this capablity study. Good luck, and may the force be with you :-).

IP: Logged

Don Watt
Forum Contributor

Posts: 70
From:Notts,United Kingdom
Registered: Mar 2000

posted 12 July 2000 04:24 PM     Click Here to See the Profile for Don Watt   Click Here to Email Don Watt     Edit/Delete Message   Reply w/Quote
Nice summary for capability study, just one question ....... What's the 10X rule?

IP: Logged

gerard jordan
unregistered
posted 02 August 2000 04:50 PM           Edit/Delete Message   Reply w/Quote
paul, just a few points though by now i'm sure you've attended to the matter. sounds like you had some good advice from fellow netters. On point of control charting etc make sure you do this manually and not via some software package. Do this for some time it's the only way to learn on such matters.
Secondly, make sure that process operators become involved in this process, ie, they contribute their wealth of knowledge and experience in determining what makes the process tick (ie, causes of varuiation)..
Thirdly, before you undertake to determine process capabilities you must firstly acknowledge whether or not the process is stable else all other efforts could prove futile.finally,is there anyone else in the plant who could undertake this study? If there isn't then something's wrong!
good luck with everything anyway.

IP: Logged

billsfan
Forum Contributor

Posts: 19
From:Kane, Pa., USA
Registered: Aug 1999

posted 11 August 2000 03:48 PM     Click Here to See the Profile for billsfan   Click Here to Email billsfan     Edit/Delete Message   Reply w/Quote
Don,
What I meant by the 10x rule is to be sure that the piece of measuring equipment used has resolution to one decimal place beyond the specification you're measuring. In plain english if you need to measure something .xx inches, you need a tool that will measure out to .xxx.
I've probably made that as clear as mud! You'll have to excuse me, Delphi has been using me as their whipping boy this month!
I'm not sure if I should s**t or wind my watch!
Anyways, back to the group....

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!