| Author | Topic: FIRST RUN CAPABILITY |
|
DEEPENDRA unregistered |
PLEAse help me out in the following matter We are having a fully automated turning line for turning of bearing races. We want to implement FRC concept in our organisation. The basic problem is that all the machines are interlinked and it is not possible to check all the pieces coming out of the machines, thus it also makes imparcticable to check all the pieces in the final inspection. since we are not knowing the 5 of OK material from each station as well as the final inspection is also on the sampling base, we are not able to calculate FRC of our machines and in turn the FRC of the line...
Contact Deependra Pareek IP: Logged |
|
Marc Smith Cheech Wizard Posts: 4119 |
What is FRP? Fix Repair Clean? IP: Logged |
|
Jim Biz Forum Wizard Posts: 275 |
I'd guess FRC is First Run Capability I didn't see an FRP? IP: Logged |
|
Marc Smith Cheech Wizard Posts: 4119 |
Oops - I was just waking up... Sorry. I can't help here. How about you other folks? IP: Logged |
|
deependraz unregistered |
FRC is first Run capability or First time through (FTT)
IP: Logged |
|
Al Dyer Forum Wizard Posts: 622 |
quote:
Are you currently QS-9000 registered? If so, what method did (or do) you use to qualify the capability of the product during the initial APQP or launch stage? What is the state of your contract review and FMEA processes? Some more/updated info for us to base an answer would be helpful. ASD... IP: Logged |