  APQP and PPAP
  Interim Approval

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Interim Approval
Douglas E. Purdy
Forum Contributor

Posts: 14
From:Schiller Park, IL
Registered: Jul 2000

posted 21 July 2000 01:39 PM     Click Here to See the Profile for Douglas E. Purdy   Click Here to Email Douglas E. Purdy     Edit/Delete Message   Reply w/Quote
Have an automotive customer who is requiring a Level 3 PPAP for a tooling rebuild, while at the same time wanting to meet the current delivery requirements. Due to the number of Special Characteristics they want for Capability Studies we are not able to turn in a complete PPAP Submittal in the time needed to get production running.

My questions are:

1) How do you submit a PSW for an Interim Approval when not all of the items are completed?

2) Is there an alternative way to meet both production requirements and PPAP requirements in this situation?

Thanks for any recommendations you may give!

------------------

IP: Logged

Laura M
Forum Contributor

Posts: 299
From:Rochester, NY US
Registered: Aug 1999

posted 21 July 2000 04:23 PM     Click Here to See the Profile for Laura M   Click Here to Email Laura M     Edit/Delete Message   Reply w/Quote
Re question 2 - that's exactly what the interim allows you to do.
When you fill out the interim worksheet you note the exceptions to "full" PPAP and what you are doing to ensure the product you are shipping. In other words, if because you did not do a full capability study, you do not (may not) know if your process is capable of producing with a 1.67 Cpk - to "guarantee" you will meet the spec. So you may add inspections, or 100% sorting for the product you ship.

Have you seen the worksheet? Fairly self explanatory. Submit what you have for PPAP with the interim documenting the exception. The B3 are used to it!

IP: Logged

Sam
Forum Contributor

Posts: 244
From:
Registered: Sep 1999

posted 21 July 2000 04:55 PM     Click Here to See the Profile for Sam   Click Here to Email Sam     Edit/Delete Message   Reply w/Quote
Maintain contact with your customer on this one.
Also refer to section II of the PPAP for interim approval requirements.

IP: Logged

Douglas E. Purdy
Forum Contributor

Posts: 14
From:Schiller Park, IL
Registered: Jul 2000

posted 24 July 2000 11:33 AM     Click Here to See the Profile for Douglas E. Purdy   Click Here to Email Douglas E. Purdy     Edit/Delete Message   Reply w/Quote
I only see a GM Interim Recovery Worksheet (GM 1411) in Section 2 of the PPAP. Diamler-Chrysler talks about an Interim Approval Authorization (IAA) document and Ford has other requirements. I do not see a worksheet generic for all three - OR am I missing something?

[This message has been edited by Douglas E. Purdy (edited 24 July 2000).]

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!