  APQP and PPAP
  Are ppap's required on steel?

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Are ppap's required on steel?
JPeters
unregistered
posted 19 October 2000 09:01 AM           Edit/Delete Message   Reply w/Quote
Our registrar wrote a minor in an audit b/c my company did not have ppap packages on file from our steel suppliers. In the PPAP 3rd Edition book it does state that for bulk, raw or indirect material, it is the Procurring Division's decision whether ppap is required. Wouldn't this fall into that clause?

IP: Logged

Rea
Forum Contributor

Posts: 12
From:
Registered: Nov 98

posted 19 October 2000 09:35 AM     Click Here to See the Profile for Rea     Edit/Delete Message   Reply w/Quote
Can you guote the section of the PPAP manual you are refering too?

IP: Logged

JPeters
unregistered
posted 01 November 2000 12:05 PM           Edit/Delete Message   Reply w/Quote
The section I am quoting is Under Appendix F under F.2 Applicability.

IP: Logged

Rea
Forum Contributor

Posts: 12
From:
Registered: Nov 98

posted 13 November 2000 10:05 AM     Click Here to See the Profile for Rea     Edit/Delete Message   Reply w/Quote
This I beleive states that if the OEM approved the steel supplier then there is no requirement for you receive a PPAP from the steel supplier.

IP: Logged

Sam
Forum Contributor

Posts: 244
From:
Registered: Sep 1999

posted 13 November 2000 12:16 PM     Click Here to See the Profile for Sam   Click Here to Email Sam     Edit/Delete Message   Reply w/Quote
Para F.2 infers that when an OEM approves a PPAP for a bulk material then you do not need approval for the material when used in other products.
Also see F.4, contact your customer about the need for a PPAP.
Your auditor is correct in issuing a minor; you did not have documented evidence that a PPAP was not required.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!