The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  APQP and PPAP
  PPAP due to discrepancy

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   PPAP due to discrepancy
Niko
Lurker (<10 Posts)

Posts: 8
From:Bradaryd
Registered: Aug 2000

posted 20 November 2000 01:17 PM     Click Here to See the Profile for Niko   Click Here to Email Niko     Edit/Delete Message   Reply w/Quote
Do I have to update the PPAP after every kind of discrepancy. For example: We may detect a discrepancy during runing production when following the control plan. After that we take actions to correct it. We scrap the parts (there were not many). Do we have to update the PPAP.

------------------

IP: Logged

Sam
Forum Contributor

Posts: 244
From:
Registered: Sep 1999

posted 20 November 2000 01:49 PM     Click Here to See the Profile for Sam   Click Here to Email Sam     Edit/Delete Message   Reply w/Quote
The PPAP has to be updated to reflect the changes made in the product and/or process.
Refer to the PPAP manual for re-submission instructions.

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!