|
This thread is carried over and continued in the Current Elsmar Cove Forums
|
The New Elsmar Cove Forums
|
The New Elsmar Cove Forums
![]() APQP and PPAP
![]() Prototype Traceability
|
| next newest topic | next oldest topic |
| Author | Topic: Prototype Traceability |
|
daveg unregistered |
Are there any specific procedures or guidelines to comply with the requirements of Ford Q1 with regards to Prototype and child parts traceability and/or documentation? IP: Logged |
|
Marc Smith Cheech Wizard Posts: 4119 |
I'm not aware of any but its been a while since I've worked on a Ford project at prototype level. IP: Logged |
|
Mr Toolie unregistered |
I just found this site. So here it goes. Ford has a extensive book on prototyping that ends in packaging requirements. On Reporting and tracability an Inspection Report Package is prepared containing 1) PPQI Data Summary 2) Modified ISR 3) Marked-up Blue print. In a nut shell all parts must be 100% checked as per agreed upon, and all the data of the completed part and it's components (with warrants) must be sent to the SQA/SQI engineer. All parts are also serialized for tracing. Believe it or not once you follow these guidelines if used properly it can be a great benifit to both companies. [This message has been edited by Mr Toolie (edited 05 April 2001).] IP: Logged |
All times are Eastern Standard Time (USA) | next newest topic | next oldest topic |
![]() |
Hop to: |
Your Input Into These Forums Is Appreciated! Thanks!
