The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  APQP and PPAP
  APQP CHECKLISTS

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   APQP CHECKLISTS
MSAFAI
Forum Contributor

Posts: 24
From:Tehran - IRAN
Registered: May 2001

posted 07 May 2001 03:50 AM     Click Here to See the Profile for MSAFAI   Click Here to Email MSAFAI     Edit/Delete Message   Reply w/Quote
Hello friends,

Any body knows what they mean by the following items in the APQP checklists:

A5 (Floor Plan Checklist)
- Impound area
- Staging area
- Are inspection points logically located to prevent shipment of NC products?

A7 (PFMEA checklist)
- where detection is the major factor, have provisions been made to control the cause prior to the next operation?

Thanks
MSAFAI

IP: Logged

Howard Atkins
Forum Wizard

Posts: 202
From:Israel
Registered:

posted 07 May 2001 05:29 AM     Click Here to See the Profile for Howard Atkins   Click Here to Email Howard Atkins     Edit/Delete Message   Reply w/Quote
quote:
Originally posted by MSAFAI:
Hello friends,

Please find my comments by the questions
quote:
Any body knows what they mean by the following items in the APQP checklists:

A5 (Floor Plan Checklist)
- Impound area
Area of quarantine, place for nconforming material

- Staging area
Area for storage and movement between stations

- Are inspection points logically located to prevent shipment of NC products?
The places that you inspect materials are placed in a logical manner so that material that does not conform will not be moved to the next station or the customer

A7 (PFMEA checklist)
- where detection is the major factor, have provisions been made to control the cause prior to the next operation?
If the major factor in the RPN is the problem of detection are the controls, inspections, testings used enough to prevent parts which are unconforming moving to the next station

Thanks
MSAFAI



I hope that this is of some help and of course is only my interpretation.

------------------
Howard Atkins, IQS
howard@iqualitys.com

IP: Logged

MSAFAI
Forum Contributor

Posts: 24
From:Tehran - IRAN
Registered: May 2001

posted 08 May 2001 07:49 AM     Click Here to See the Profile for MSAFAI   Click Here to Email MSAFAI     Edit/Delete Message   Reply w/Quote
Thanks Howard,

very much appriciate your help. Your interpretations seem quite sound and logical.

Thanks again.
MSAFAI

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!