The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  Nonconformance and Corrective Action Systems
  Issuing Countermeasure Report

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   Issuing Countermeasure Report
Angelito Martinez
unregistered
posted 14 January 2001 10:12 PM           Edit/Delete Message   Reply w/Quote
From: "Angelito Martinez" [email protected]
To: Marc
Subject: Issuing Countermeasure Report
Date: Mon, 15 Jan 2001 11:16:31 +0800

To all concerned:

We are a Manufacturing Firm newly established at Lipa City Batangas, Philippines.At present I am handling the Incoming Inspection Section and the Supplier group Section. What do I want to ask for an opinion is that, Is all non-conformity and defect found in line process or in Incoming Inspection should have their corresponhding abnormality report or couintermeasure report eventhough the severity of the deect is quite not critical to the product?

I would much appreciate if you have reply on this matter.

Thank you.

Lito Martinez
Incoming QA Section Head

IP: Logged

Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 16 January 2001 07:57 AM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
I'm not sure what an 'abnormality report' is but I assume it's just a report saying a nonconformance was identified. A countermeasure report is, I am assuming, a corrective action report.

When you identify a nonconformance you are supposed to identify it and record it, but someone or a group has to determine whether that nonconformance 'requires' a corrective action. Typically a corrective action is not required for every identified nonconformance - you could end up doing little but working on corrective action reports.

IP: Logged

Al Dyer
Forum Wizard

Posts: 622
From:Lapeer, MI USA
Registered: Oct 2000

posted 16 January 2001 06:52 PM     Click Here to See the Profile for Al Dyer   Click Here to Email Al Dyer     Edit/Delete Message   Reply w/Quote
Are there FMEA's in place?

Even if a nonconformance report is or is not issued, I believe that a good practice would be to update the FMEA and corresponding recommended action.

ASD...

------------------
Al Dyer
Mngt. Rep.
[email protected]

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!