The may be straight forward, but we have had some discussion here so I wanted a outside opinion for clarification. Example: Parts are rejected from the mfg floor for a nonconformance, some problem with them. Its not a serious trend right now, the rejection of this part. The question would be, Can a Preventive Action be written to have this part that remains in stock, checked and if necessary rejected, so no more are issued to the floor to prevent further rejects which slows production? Thank you for your input IP: Logged |
|
Jim Biz Forum Wizard Posts: 275 |
Just IMHO: I'd call it corrective: it already happened wether or not it got shipped out or not it was not prevented before it occured.... if/when there are other similar products that may show the same condition in the future then I'd call those actions preventative. Guess I'm operating on the assumption that the error in reality-found-you or occured prior to a preventative application in place ... that's corrective - any action taken prior to an actual error occuring is preventative Regards IP: Logged |
|
Al Dyer Forum Wizard Posts: 622 |
Jim, Agree that this instance is a corrective action. Shouldn't the initial corrective action also identify like proceeses/products that could be affected and therefore corrected? If the same problem occurs again in the like process that has been corrected, wouldn't that then become another corrective action and open up the effectiveness of the original corrective action. I think we are on the same wave length: Corrective Action - Occurred ASD... IP: Logged |
|
D.Scott Forum Contributor Posts: 37 |
I sure don't want to get hung up on semantics here and basiclly I agree with Al but I don't think his definitions go far enough to seperate Prevention and Continuous Improvement. To be a Prevention, it must have the same "all's well" characteristic as the C/I. To me the big difference is that the true Prevention has no measureable or goal (other than 0 which has been the state all along - otherwise you would be doing a C/A). There is never an occurance if the Prevention is successful. On the other hand, every C/I has a goal and a measureable (or else it would be called a "Continuous Status-Quo"). Just my opinion but it seems to make life easier here in tracking and the auditors have never raised an objection. Dave IP: Logged |
|
Al Dyer Forum Wizard Posts: 622 |
quote: Dave, I agree, I did not go far enough into the thought process behind my comment. Here goes, A hypothetical situation #1: I use FMEA review and prioritize the RPN's for preventive action projects. Do I have a measurable? Yes, the reduced RPN (if successful) Do I gave a goal? Yes, the lowest RPN possible. Can I have an RPN of "0"? Common sense says no, no process is perfect. Hypothetical #2: I am running a daily chart on out internal PPM. The goal (limit) is 25. 1: My daily reading for the last month show I am consistently running in a range of 5-10 PPM. I say, people we can do better. Let's start a "continuous improvement" project. 2: Same as month 1 (5-10 PPM). At the start of month 2 we start to see the daily PPM's creeping up towards 13-18. I say, people, let's start a "preventive action" project. My reasoning is that we are within our goals but we want to prevent the PPM from going any higher. 3: Same as month 1 (5-10 PPM. I look at yesterdays data and see that the PPM is at 50. I say, people, shut down the process and begin a "corrective action" immediately! I think any auditor worth their salt will see that there is a fine line between preventive action and continuous improvement. If a company documents that they are acting upon their defined measurables and improving their processes and systems there should be little discussion between the fine line between the 2 activities. ASD... IP: Logged |
|
Marc Smith Cheech Wizard Posts: 4119 |
quote:Also see http://https://elsmar.com/ubb/Forum31/HTML/000023.html and If your question is: In so far as whether or not to request a corrective action in this case you have to look at things holistically. If you got bad parts in and it is a rare case - never happened before or maybe it happened last year but a different supplier (or maybe even the same supplier) - and it's not serious (such as it doesn't shut down your line or something) then you probably will not want to ask for a CA. Use common sense. Your system should allow you to write up a nonconformance report which will trigger containment (which would include a stock purge) without requiring a corrective action. Corrective actions take time and cost money. You ought to have a good reason for one before you request one. The logic ruling is: IP: Logged |