|
This thread is carried over and continued in the Current Elsmar Cove Forums
|
The New Elsmar Cove Forums
|
The New Elsmar Cove Forums
![]() Measurement, Test and Calibration
![]() Calibration of Temperature and Pressure Controller
|
| next newest topic | next oldest topic |
| Author | Topic: Calibration of Temperature and Pressure Controller |
|
Vash Stampede Forum Contributor Posts: 20 |
Hello Everyone, We have our temperature and pressure controller declared as equipment in our masterlist. Its been three weeks now since we register our tape and reel machines. Since, these controllers are installed on TNR machines. Thus, after declaring this we must produce or generate a calibration procedure for this. We are at pressure right now, since were hoping we can have it declared as one. That is, a calibration procedure that will for our TNR machines. Would it be possible for us to incorporate the calibration procedure for these controllers and our machines as one? Any feedback would be appreciated. Please advice. Thanks in advance. Vash Stampede [email protected] IP: Logged |
|
Marc Smith Cheech Wizard Posts: 4119 |
Yes - this is not unusual. You must specifically declare that the calibration is calibration as a system. IP: Logged |
All times are Eastern Standard Time (USA) | next newest topic | next oldest topic |
![]() |
Hop to: |
Your Input Into These Forums Is Appreciated! Thanks!
