The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  Measurement, Test and Calibration
  A2LA Traceability Policy

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   A2LA Traceability Policy
Marc Smith
Cheech Wizard

Posts: 4119
From:West Chester, OH, USA
Registered:

posted 03 January 2001 10:20 PM     Click Here to See the Profile for Marc Smith   Click Here to Email Marc Smith     Edit/Delete Message   Reply w/Quote
Date: Fri, 29 Dec 2000 09:25:05 -0500 (EST)
From: Greg Gogates
To: iso25@quality.org
Subject: A2LA Traceability Policy

Date: Thu, 28 Dec 2000 18:37:43 -0800
From: Thomas G Smith / Smith Corporate Metrology calman@chibardun.net
To: Greg Gogates iso25@fasor.com
Subject: A2LA Traceability Policy

Greetings from Rice Lake Wisconsin, where it is -17F and we are expecting 6 inches of snow tonight. I just wanted bring up a reoccurring issue I run into during assessments. As many know, We expect a compliant calibration certificate when we send our equipment to be calibrated. I receive many calls at my lab that ask if we are accredited, and that's where it usually ends. As we do have a large scope, we don't run into too many situations where we can't calibration a piece of equipment within our scope, but it does happen. We catch this in our contract review. which brings me to my point.

When you are going to send equipment out to a calibration service provider, and you are A2LA Accredited, A2LA has a Traceability Policy that was issued 08/2000. The old process of submitting a waiver has gone to the wayside.

When you send your equipment out, Specifically Request in writing (on your P.O.) that the provider provide a accredited calibration with uncertainty expressions for the reported measured values (if you are not using a national lab). Also state that all calibrations you have listed must be within their scope or notify you if they are going to subcontract the calibration to another accredited supplier. This action of being specific on your p.o. is preceded by your careful investigation of that provider (obtaining a copy of their scope and supplement), Obtaining a written Quote from the supplier and have them identify the items they can provide within their scope and looking for your self that the service you are requesting is within their scope and even a desk audit. (your process of approving providers will dictate the needed elements to follow).

In short, this brief reminder will save much adieu over traceability. This is not everything, just a short list of actions that could be taken when A2LA Test and Calibration labs use Calibration Suppliers.

Thomas G. Smith
a.k.a. The Duke
International Metrology Services
President / National Calibration and Testing Labs
A2LA Accredited Calibration, Site Calibration, Inspection
1-800-593-7617 / Fax 1-763-593-7620
A2LA Lead / Technical auditor

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!