The Elsmar Cove Business Standards Discussion Forums More Free Files Forum Discussion Thread Post Attachments Listing Elsmar Cove Discussion Forums Main Page
Welcome to what was The Original Cayman Cove Forums!
This thread is carried over and continued in the Current Elsmar Cove Forums

Search the Elsmar Cove!

Wooden Line
This is a "Frozen" Legacy Forum.
Most links on this page do NOT work.
Discussions since 2001 are HERE

Owl Line
The New Elsmar Cove Forums   The New Elsmar Cove Forums
  Miscellaneous Quality Topics
  dock audit manners

Post New Topic  Post A Reply
profile | register | preferences | faq | search

UBBFriend: Email This Page to Someone! next newest topic | next oldest topic
Author Topic:   dock audit manners
vitoter@cmi
Lurker (<10 Posts)

Posts: 1
From:Laredo,Texas,USA
Registered: May 2000

posted 16 November 2000 08:20 AM     Click Here to See the Profile for vitoter@cmi   Click Here to Email vitoter@cmi     Edit/Delete Message   Reply w/Quote
Are there any procedures that shows how to do the dock audits?

IP: Logged

Rick Goodson
Forum Wizard

Posts: 102
From:Wuakesha, Wisconsin, USA
Registered: Aug 2000

posted 16 November 2000 05:46 PM     Click Here to See the Profile for Rick Goodson   Click Here to Email Rick Goodson     Edit/Delete Message   Reply w/Quote
I can't help with a procedure, but can explain what I use to do in a prior life.

Our products were electro-mechanical and produced to our specifications as opposed to a customer spec. Each morning we randomly selected a product line and product (pull the chip out of a container) based on the shipping plan for that day. Around lunch we would randomly select a package sitting on the dock ready to ship. The package would be inspected against the packaging specifications including opening and checking the packing materials, etc. The product was then inspected and tested to the manufacturing and engineering specifications. We then had it repacked and put it back on the dock. Weekly we issued a report with the results of the audits. Obviously, any non-conformances noted went throught the non-conforming material and corrective action processes.

IP: Logged

Al Dyer
Forum Wizard

Posts: 622
From:Lapeer, MI USA
Registered: Oct 2000

posted 16 November 2000 06:01 PM     Click Here to See the Profile for Al Dyer   Click Here to Email Al Dyer     Edit/Delete Message   Reply w/Quote
I have never seen a specific "procedure" for dock audits, we have it included as a section of our final inspection procedures.

Some thoughts for your consideration:

Set up a matrix of part numbers (or part families) and set an ititial frequency of the audit. (based on past quality history)

Subsequent audits results (and if QS-9000, PPM ratings) will drive the revision of audit frequency.

Design some sort of check sheet to determine what will be reviewed during the audit. We review the packaging, bar-coding, labeling and verify that all previous inspection activities have been completed and meet customer specification.

If there are special characteristics we take a specified sample size and measure it against the customer requirement.

Document results and report results at management review.

As an aside, I would like to see some other input about any differences in "dock audit" (4.10) in QS-9000 and "Product Audit" (4.17) in TS-16949. TS seems to have more lee-way.

ASD...

------------------
Al Dyer
Mngt. Rep.
ullysses3@excite.com

IP: Logged

All times are Eastern Standard Time (USA)

next newest topic | next oldest topic

Administrative Options: Close Topic | Archive/Move | Delete Topic
Post New Topic  Post A Reply Hop to:

Contact Us | The Elsmar Cove Home Page

Your Input Into These Forums Is Appreciated! Thanks!


Main Site Search
Y'All Come Back Now, Ya Hear?
Powered by FreeBSD!Made With A Mac!Powered by Apache!