A
Alan Au
Dear all,
I have a silly question. I was questioned/challenged by a colleague that if the assemble of a functional prototype shall be considered as a production process. We are a design house for consumer products. We will design the product according to the customer ideas and we will deliver not only the design documents/drawings but also functional prototype for demostration purpose only (after receiving the design and the prototype, our customer will do their production). So the question is: is the purchasing of components and assemble of the prototype be considered as a production process and shall be controlled by 7.4 and 7.5 in ISO9001?
Thanks for any comment in advance.
Alan AU
I have a silly question. I was questioned/challenged by a colleague that if the assemble of a functional prototype shall be considered as a production process. We are a design house for consumer products. We will design the product according to the customer ideas and we will deliver not only the design documents/drawings but also functional prototype for demostration purpose only (after receiving the design and the prototype, our customer will do their production). So the question is: is the purchasing of components and assemble of the prototype be considered as a production process and shall be controlled by 7.4 and 7.5 in ISO9001?
Thanks for any comment in advance.
Alan AU