M
Mary - QA Manager
I have been tasked to create checklists for one element of ISO9001/AS9100 Section 7.3 Design and Development.
I found an old checklist and it looks like the person cut and pasted each section of the documented process into the checklist. Is this acceptable?
I found an old checklist and it looks like the person cut and pasted each section of the documented process into the checklist. Is this acceptable?
Last edited by a moderator: