DVP&R Information and/or Instructions
In general, my question is more along the lines of the definitions of the requirements. Design requirements as listed on the customer drawing are understood as being part of the testing to be verified. Are there any other requirements that I should be considering? We are not design responsible, so a Design
FMEA was not completed by our group.
As an aside to this, are the requirements that are listed on the DVP&R then become part of the Control Plan?