Dear All,
I have read through the procedure of computing the absolute wave duration measurements for CTS / CSE database signals.
For the CTS database signals, the procedure mentioned is.
1. Compute the differences for each individual LEAD Measurement (Q-,R-,S- durations) for leads I, II, V1....V6.
Clarification Required:
Does the above sentence mean, we need to compute the Q,R,S Durations of each beat in a lead. (Ex.: Q, R, S, Durations present for all the beats in Lead-1)
or does it mean to compute the differences of Q,R,S- duration of each beat in lead-1 with the Q,R,S- duration of each beat in lead-2 and later continue with taking difference of Lead-2 beat measurement with Lead-V1 beat measurement etc.
If the 1st step is clarified the remaining steps can be carried out.
Thanks and Regards,
Subbash
I have read through the procedure of computing the absolute wave duration measurements for CTS / CSE database signals.
For the CTS database signals, the procedure mentioned is.
1. Compute the differences for each individual LEAD Measurement (Q-,R-,S- durations) for leads I, II, V1....V6.
Clarification Required:
Does the above sentence mean, we need to compute the Q,R,S Durations of each beat in a lead. (Ex.: Q, R, S, Durations present for all the beats in Lead-1)
or does it mean to compute the differences of Q,R,S- duration of each beat in lead-1 with the Q,R,S- duration of each beat in lead-2 and later continue with taking difference of Lead-2 beat measurement with Lead-V1 beat measurement etc.
If the 1st step is clarified the remaining steps can be carried out.
Thanks and Regards,
Subbash