L
luciano
Dear friends,
Should I have a different inspection level for incoming parts with critical characteristics?
For the moment we take 5 parts for every batch(dimensional characteristics). For critical characteristics should I increase the level of inspection ? If I received the capabilities for that characteristics is this enough to maintain the same level (5 parts) of inspections ?
Thank you and God bless all of you.
Should I have a different inspection level for incoming parts with critical characteristics?
For the moment we take 5 parts for every batch(dimensional characteristics). For critical characteristics should I increase the level of inspection ? If I received the capabilities for that characteristics is this enough to maintain the same level (5 parts) of inspections ?
Thank you and God bless all of you.