At what stage do you review new product statutory / regulatory requirements?

A

Andrews

#1
At what stage do you review the statutory / regulatory requirements required for any new product ? Is it during the pre-contract (quotation) stage or the contract review (during order acceptance ) stage?

What are the points you review during quotation and points reviewed during order acceptance stage.
 
Elsmar Forum Sponsor

JodiB

Still plugging along
#2
Personally, I wouldn't quote for a product without knowing exactly what I was dealing with, so I would review the req's at quotation stage. Why waste time preparing a quotation that may turn out to be invalid?

At any rate, you must review req's and determine that you can meet those req's prior to accepting the contract.
 

johnnybegood

Involved In Discussions
#3
5.1 Management Commitment, requires Top management to communicate to the organization the importance of meeting customer as well as statutory and regulatory requirements. What it meant by statutory and regulatory here and what objective evidence do I need to fulfil this.
 
G

Graeme

#4
johnnybegood said:
... What it meant by statutory and regulatory here and what objective evidence do I need to fulfil this.
A statutory requirement is a law that you, your company or your product must comply with.

A statutory requirement is a government regulation that you, your company or your product must comply with. A regulation often implements a law, in much the same way that a procedure implements a policy.

Failure to comply with a law may result in a criminal penalty, and failure to comply with a regulation may result in a civil or administrative penalty.

What laws or regulations apply depend on where you are geographically located, and where your product is sold or used. That is all something that top management (or more likely the company lawyers) have to determine. Laws and regulations usually contain information about required records, or that information may be elsewere.

I work in a regulated industry (an airline) -- statutory and regulatory requirements are a way of life, and are always above the QMS and other company policy. Also, international treaties that apply are treated as statutory requirements.
 

CarolX

Super Moderator
Super Moderator
#5
how did you?

johnnybegood said:

5.1 Management Commitment, requires Top management to communicate to the organization the importance of meeting customer as well as statutory and regulatory requirements. What it meant by statutory and regulatory here and what objective evidence do I need to fulfil this.
My question....

What have been the ways any of you have addressed OSHA regs? Is the safety policy sufficient to show management commitment?

Thanks,
CarolX
 
R

ralphsulser

#6
We have just been certified (last week) to ISO 14001. We have a EHS Manager who is responsible fot this system.
Does this meet the statutory, and regulatory requirements? :confused:
 
J

jalarson

#7
HELLO,

FIRST POST, I AM WITH AN ENGINEERING CONSULTANT COMPANY AND AS FAR AS STATUTORY/REGULATORY REQUIREMENTS WOULD I BE INCLUDING SOFTWARE LICENSING?

JALARSON
 

Randy

Super Moderator
#8
Ralph...No

Jalarson...Yes

Andrews...At the beginning of the planning process of product realization. Look at issues directly related to the product, the making of the product and the delivery of the product. There may be some requirements that are not specified in contracts or customer specifications that can effect the realization process and ultimately customer satisfaction.
 
Thread starter Similar threads Forum Replies Date
O ISO 13485 - Is management review required before stage 1? ISO 13485:2016 - Medical Device Quality Management Systems 6
A A purpose of a Stage 1 audit - Off site document review Registrars and Notified Bodies 3
N What is involved in a Stage 1 Review? General Auditing Discussions 7
S TS 16949 Stage 1 Readiness Review for remote location processes...? IATF 16949 - Automotive Quality Systems Standard 9
P Peer Review prior to Stage 2 Audit - Acceptable or Not? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 25
B Is it Compulsory to complete Management Review before Stage 1 Audit? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 22
M Readiness Review Failed - Stage one audit for TS16949 IATF 16949 - Automotive Quality Systems Standard 7
L Stage One Audit vs. Document Review - TS16949 - Need clarification IATF 16949 - Automotive Quality Systems Standard 5
I Passed TS 16949 Stage 1 Readiness Review! Happy Dance! IATF 16949 - Automotive Quality Systems Standard 7
Dean Bell Implementation of Controls as per SOA for Stage 2 Audit IEC 27001 - Information Security Management Systems (ISMS) 0
L Stage 2 audit - Requirement for 3 months of records ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 5
O ISO13485 implementation - Are internal audits expected before stage 1 audit? Design and Development of Products and Processes 3
Jacquie Collins Stage 2 Audit ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 2
R What happens during a Stage 1 MDSAP audit? ISO 13485:2016 - Medical Device Quality Management Systems 4
I QMS documents required at each stage of Software development IEC 62304 - Medical Device Software Life Cycle Processes 5
A Doubt on multiple inspection carrying out for same balloon number during Stage Inspection and Final Inspection? Inspection, Prints (Drawings), Testing, Sampling and Related Topics 3
W Closing of Stage 2 Audit Nonconformances AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
A Determining the Scope of the QMS during Stage 1? Registrars and Notified Bodies 11
E Interesting Discussion Was this the fastest ever stage 2 ISO9001:2015 audit? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 76
Q Stage 1 audit observations - documented report? General Auditing Discussions 5
Y Application of IEC/EN 62304 at an advanced stage of software development IEC 62304 - Medical Device Software Life Cycle Processes 4
K MDSAP Stage 1 Guidance Documents ISO 13485:2016 - Medical Device Quality Management Systems 1
K AS9100 - No NCR's or CA's during Stage 2 Audit AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
N Non-conformances whilst in the Design and Development stage of a project ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 8
S We had our Stage 2 Audit on 2/19 & 2/20.... AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 6
B Supplier Certificate Suspended in OASIS - Do we need stage 1 and 2 to reinstate cert? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 2
S Risk Management at the Quote Stage AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
A Stuck at 'Analyse' stage of DMAIC Improvement Cycle on Cosmetic Specification Manufacturing and Related Processes 10
J Major Nonconformance on Stage 2 Audit causes to start over Stage 1? IATF 16949 - Automotive Quality Systems Standard 2
G Best X-Y Microscope Stage for Submicron Accuracy Capability, Accuracy and Stability - Processes, Machines, etc. 2
V How long can a development stage incident be open? Pharmaceuticals (21 CFR Part 210, 21 CFR Part 211 and related Regulations) 4
R PFMEA (process FMEA) for Incoming Material stage FMEA and Control Plans 3
N AS9110 Audit Stage 2 - What procedures are required? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 3
Crusader What are the CB's inputs and deliverables at Stage 1? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 17
C ISO 22000 Stage 1 NC's - PRPs not approved and Objectives not inline with Policy Food Safety - ISO 22000, HACCP (21 CFR 120) 3
S Root Cause - Left 5.6.2 paragraph (f) out of Quality Manual during Stage 1 Audit Nonconformance and Corrective Action 21
M What to do during a Stage 1 External Audit? AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 8
S Is a Stage 1 Audit required for ISO 50001 Certification? Sustainability, Green Initiatives and Ecology 1
E Risk Management - Planning Stage (AS9100C Section 7.1.2(d)) AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 1
B Certification Body insist on evidence of Preventive Action during Stage 2 audit ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 9
M Implementing an AS9100 Quality System - Stage 1 Audit for AS9100 is Oct 2012 AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 22
D ISO/TS 16949 Stage 2 Audit Nonconformance Against 7.6.3.1 Laboratory Scope IATF 16949 - Automotive Quality Systems Standard 8
K Internal Audits - Necessary before Stage 1 Audit? ISO 9000, ISO 9001, and ISO 9004 Quality Management Systems Standards 42
J Waiting for an Auditor after our AS9100 Stage Two Audit AS9100, IAQG, NADCAP and Aerospace related Standards and Requirements 19
C Contract Manufacturer and Stage 2 Audit for ISO 13485 ISO 13485:2016 - Medical Device Quality Management Systems 5
C At what stage does Design Control play a role in Medical Device Development ISO 13485:2016 - Medical Device Quality Management Systems 2
P MEP Method Statement during Tendering Stage of Railway Station Benchmarking 1
A Magnification for One Stage Dial Gauge Mechanism General Measurement Device and Calibration Topics 1
X Fanuc Injection Moulding Machine - Variable stage speed/pressure injection profiles Manufacturing and Related Processes 1
K Stage 1 Audit Advice for a new Lead Auditor General Auditing Discussions 5

Similar threads

Top Bottom