T
tennis_girl
We are purchasing an automated instrumentation system from a manufacturer who will develop the system to our specification based on existing platforms that they already manufacture. We will conduct all the testing in-house and file the Classs II 510(k) for the finished system.
I've reviewed the applicable guidance doc for this type of instrument however I want to know if we need to test each of subassembly/components seperately before they are integrated into the finished system or only as a finished system which they are providing?
Thanks in advance
I've reviewed the applicable guidance doc for this type of instrument however I want to know if we need to test each of subassembly/components seperately before they are integrated into the finished system or only as a finished system which they are providing?
Thanks in advance